ASME Y14.1-2020 确定尺寸及规定公差.pdf

ASME Y14.1-2020 确定尺寸及规定公差.pdf
仅供个人学习
反馈
标准编号:
文件类型:.pdf
资源大小:20.1 M
标准类别:机械标准
资源ID:288162
下载资源

标准规范下载简介

ASME Y14.1-2020 确定尺寸及规定公差.pdf

3.11 Drawing Format

drawing format: the arrangement and organization o information within a drawing.This includes such features as the size and arrangement of blocks, notes, lists, revision information, and use of optional or supplemental blocks [ASMEY14.100]

2DrawingGraphic Shee

3.13 Engineering Data

JCT2370-2016 精细高岭土3.14 Field of Drawing

product definition of an item (ASME Y14.100).

eld of drawing: the area of a drawing that contains the oroduct definition of an item (ASME Y14.100).

3.16 Original

original: the current design activity's reproducible drawing or dataset on which is kept the revision record recognized as official (ASME Y14.100).

original: the current design activity's reproducible drawing or dataset on which is kept the revision record recognized as official (ASME Y14.100).

3.18 Procuring Activity

3.18 Procuring Activity

procuring activity: the customer (ASME Y14.100)

3.19Referenced Docume

referenced documents: design activity standards, draw ings, specifications, or other documents referenced on drawingS or lists (ASME Y14.100)

3.20 Segment

are usedforspecific processing (e.g.,microfilming or other form of reproduction),

321 Standard

standard: a document that establishes technical criteria, methods, processes, and practices (ASME Y14.100).

standard: a document that establishes technical criteria methods, processes, and practices (ASME Y14.100). 22LComnauStrndard

Standardization Docume

standardization document: a document developed for the purpose of standardizing items, materials, processes, or procedures (ASME Y14.100)

3.23Acronyms

Acronyms Terms ASME The American Society of Mechanical Engineers CAGE Commercial and government entity DAI Design activity identification UOS Unless otherwise specified

3.24 Abbreviations

4DRAWINGSHEETSIZES

4.1 Margins

4.1.1 Format Margins. The format margin sizes showi inapplicablefigures are the minimum required NOTE: Additional design activity nonproduct definition data ma be added within the drawing format margins

4.1.1 Format Margins. The format margin sizes shown in applicable figures are the minimum required NOTE: Additional design activity nonproduct definition data may be added within the drawing format margins

4.2 Drawing Sheet Sizes

4.2.1Metric Drawing Sheet Sizes

5.1 Drawing Sheet One

5.2ContinuationSheets

The sizes of blocks specified herein are minimum size andmaybe increased to accept sizeandletteringon drawing formats in accordance with ASME Y14.2. For block content, see para. 6.2. Additional blocks may be added

5.4 Lettering

The size and style of lettering printed on drawing ormatsshallbe inaccordancewithASMEY14.2.

Line widths shall be in accordance with ASME Y14.2 When contrasting line widths are used, the following guidelines may be used:

(a) Thick Lines (1) borderlines (2) outline of principal blocks (3) main divisions of blocks (4) segment match lines (b) Thin Lines (1) divisions ofparts lists and revision history block (2) minor subdivisions of the title block and supple entaryblocks (3) zonemarkers

5.7SegmentAlignment(Optional)

6 TITLE BLOCKS

6.1 Location

6.2 Contents

ntinuation Sheet Title Bld

7REVISIONHISTORYBLOCK

7.1 Location

7.2 Contents

BREVISIONSTATUSOESHEETSBLOCK

9ASSOCIATEDLISTS

See ASME Y14.34 for sheet sizes and formats of asso

See ASME Y14.34 for sheet sizes and formats of asso ciatedlists

1OADDITIONALDATABLOCKS(OPTIONAL

10.1 Angle of Projection Block

10.2 Dimensioning and Tolerancing Block

DB44/T 1345-2014 车载GPS北斗双模卫星定位导航终端设备可靠性试验方法.pdf10.3 Application Block

IIADDITIONALDRAWINGNUMBERBLOCKS (OPTIONAL) L1.1 Margin Drawing Number Block

11.2Elongated Drawing Sheet Size Segmen

12 DATAMARKINGS

GB/T 25066-2020标准下载the remaining sheet size (2) Format margins do not include added protective or binding margins. See paras. 4.1.2 and 4.1.3.

NOTES (1) Zone sizes shall be equal, no less than 1 in., and no more than 5.50 in. (2) Format margins do not include added protective or binding margins. See paras. 4.1.2 and 4.1.3

1) Zone sizes shall be equal, no less than 1 in., and no more than 5.50 in

©版权声明
相关文章