11.3.4 Conformity control

Contormity controlisexercisedto veritythat a particularservice orproductionfunctionhas carried out in conformity with the specifications previously established. Conformity control is generally part of the external control.

11.4VERIFICATIONSYSTEMS

衡山大桥施工组织设计According to the purpose andtiming ofthe control,the following stages maybe distinguished:

11.6 CONTROL OF DESIGN

Control of designshallconformwithstatutory andadministrativeprocedures.

Control of design shall conform with statutory and administrative procedures.

CONTROLOFPRODUCTIONANDCONST

11.7.1 Obiectives

1.7.2Itemsofproductionandconstruction The obiects which need to be controlle

oroductionandconstruction cts which need to be controlled are summarised i

ch need to be controlled are summarised in Table

11.7.3Elementsofproductionandconstruction

11.7.4Initial tests

11.7.5Checksduringconstruction

11.7.5.1Generalrequirements

11.7.6 Conformity controls

PRESTRESSED CONCRETE

2.1BASISOFDESIGN

12.1.1 General

12.1.2 Alternative methods

ncertaln ctionmaybeinappropriateandamoresuitable method should be adopted which takes into account of the special nature of the structure.

12.1.3Serviceabilityclassification

Intheassessmentof thelikelybehaviourofaprestressedconcrete structure orelement,theamount of flexural tensile stress allowed under service load defines its class as follows: (a)class 1: no flexural tensile stresses; (b) class 2:flexural tensile stresses but no visible cracking; (c) class 3:flexural tensile stresses but surface width of cracks not exceeding 0.1 mm for members in exposure conditions 3 or 4 (see table 4.1) and not exceeding 0.2 mm for all other members

Intheassessmentof thelikelybehaviourofaprestressedconcrete structure orelement,theamount of flexural tensile stress allowed under service load defines its class as follows: (a)class 1: no flexural tensile stresses; (b) class 2:flexural tensile stresses but no visible cracking; (c) class 3:flexural tensile stresses but surface width of cracks not exceeding 0.1 mm for members in exposure conditions 3 or 4 (see table 4.1) and not exceeding 0.2 mm for all other members

12.1.4 Critical limit state

Ingeneral,the design of class 1and2 members is controlledbythe concretetensionlimitatio service load conditions, but the design ultimate strength in flexure, shear and torsion shou checked. The design of class 3 members is usually controlled by ultimate limit state conditions deflection

Ingeneral,the design of class 1and2 members is controlledbythe concretetensionlimitatio service load conditions, but the design ultimate strength in flexure, shear and torsion shou checked. The design of class 3 members is usually controlled by ultimate limit state conditions deflection

12.1.5Durabilityandfireresistance

12.1.7Loads

12.1.7Loads

12.1.7.1 Load values

values of thedesign ultimate loadsarethosegiven in clause2.3.2.The design loads to be used he serviceabilitylimit statesarethecharacteristicvalues

In general, when assessing any particular effect of loading, the arrangement of loads should be that causing the most severe effect. Consideration should be given to the construction sequence and to the secondary effects due both to the construction sequence and to the prestress particularly for the serviceability limit states.

12.1.8 Strengthofmaterials

STRUCTURESANDSTRUCTURALFRAMES

12.2.1Analysis of structures

12.2.2 Relative stiffness Relative stiffness s

12.2.2Relativestiffness

Relativestiffnessshouldgenerallybebasedonthe concrete sectionas describedinclause 5.1.2

12.2.3Redistribution of moments

1223.1 General

123.1General

The definitions andlimitations ofthe geometricpropertiesfor prestressedbeams are asgiv einforced concrete beams in clause 6.1.2.1 except that the overall depth of the member shou usedinsteadoftheeffectivedepth

12.3.2Slender beams

12.3.3Continuousbeams

12.3.4Serviceability limitstateforbeams

12.3.4.1 Section analysis

12.3.4.2Compressivestressesinconcrete

Note:Intermediatevalues arefoundbyinterpola

12.3.5Stress limitations at transfer for beams

12.3.6Deflectionofbeams

12.3.6.1 General

set. For reinforced concrete, in all normal cases, deflections are controlled by limiting the ratio of spantoeffectivedepth.Ingeneral,thisapproachisnotpossibleforprestressedconcrete,because of the major influence of the level of prestress.When it is considered necessary to calculate deflections.themethods outlined in clause 12.3.6.2 may be used

12.3.7Ultimatelimitstateforbeamsinflexur

12.3.7.1Sectionanalysis

JB/T 13887-2020 自动控制回流阀.pdf12.3.7.2 Symbols

700002, fabd fpuAps fobd

12.3.7.4Allowanceforadditionalreinforcement inthetensionzone In the absence of a rigorous analysis, the area of reinforcement As may be replaced by an equivalent area of prestressing tendons Asfy/ fpur

.4A/lowanceforadditionalreinforcementinthetensionzone In the absence of a rigorous analysis, the area of reinforcement As may be replaced

12.3.8Designshearresistanceofbeams

JGJ336-2016 人造板材幕墙工程技术规范12.3.8.1 Symbols