施工组织设计封面及目录

施工组织设计封面及目录
仅供个人学习
反馈
文件类型:.zip解压后doc
资源大小:61.44K
标准类别:施工组织设计
资源属性:
下载资源

施工组织设计下载简介

内容预览随机截取了部分,仅供参考,下载文档齐全完整

施工组织设计封面及目录

题目:施工组织毕业设计

院系:建筑与土木工程学院

院系建筑与土木工程学院专业建筑工程管理

年级08级学号0804020422姓名韩鹏杰

JB/T 12435-2015标准下载答辩委员会主任(签章)

班级建工管0804学生姓名韩鹏杰学号0804020422

发题日期:年月日完成日期:年月日

应完成的硬件或软件实验

应交出的设计文件及实物(包括设计论文、程序清单或磁盘、实验装置或产品等)

指导教师提供的设计资料

要求学生搜集的技术资料(指出搜集资料的技术领域)

本设计是本人独立完成;

本设计没有任何抄袭行为;

若有不实,一经查出,请答辩委员会取消本人答辩资格。

               承诺人:叶飚

2008年 01月 14日

第一章:工程概况···············································(1)

1.1现状概况················································(1)

1.2布局规划················································(1)

1.3项目部组织机构及职责·····································(3)

第二章:施工部署···············································(9)

第三章:主要施工保证措施······································(10)

3.1内业准备················································(10)

3.2轴线引测················································(10)

3.3新上岗人员进行培训到位··································(10)

第四章:工程测量与施工放线···································(12)

4.1测量放线的基本要求·····································(12)

4.2施工测量前的准备工作···································(13)

第五章:施工方法及技术措施···································(14)

5.1三合土场地·············································(14)

5.1.1施工方法·············································(14)

5.1.2技术措施·············································(14)

5.2砼场地·················································(14)

5.3花岗岩广场··············································(15)

5.4铺装场地···············································(16)

5.5人工挖基坑槽···········································(16)

5.6土方回填工程···········································(16)

5.7砌砖工程···············································(17)

5.8砌石工程···············································(17)

5.9钢筋砼工程·············································(17)

5.10外墙装饰面施工········································(19)

5.11给水管道安装··········································(19)

5.12排水管道安装··········································(20)

5.13草坪灯、投光灯、水下灯安装······························(20)

5.14地埋灯及庭院灯安装····································(21)

5.15绿化工程··············································(21)

第六章:质量保证措施···········································(23)

6.1各项质量管理制度·······································(23)

【河南地标】12YD3 10-0.4kV变配电所微机综合保护系统6.2质量通病防治措施·············································(26)

6.3季节性施工技术措施·····································(26)

6.3.1雨季施工技术措施·····································(26)

6.3.2高温季节施工技术措施·································(27)

6.4确保工期组织措施·······································(27)

6.5安全生产技术措施及消防保证措施·························(28)

6.6文明生产、文明施工措施··································(33)

花园住宅工程混凝土施工方案6.7环保措施···············································(34)

©版权声明
相关文章