北京财富中心大体积砼施工方案

编制依据····························································1

1.1施工组织设计······················································1

1.2施工图····························································1

中国银行施工组织设计1.3施工规程、规范····················································1

1.4主要标准··························································2

1.5主要标准图集······················································2

1.6其他······························································2

工程简介····························································3

2.1工程位置及周边环境················································3

2.2设计简介··························································3

2.3重点与难点························································5

施工安排····························································6

3.1施工计划安排······················································6

3.2成立协调指挥中心··················································6

3.3选择商品混凝土搅拌站··············································6

3.4混凝土浇筑顺序····················································6

3.5混凝土输送方式····················································6

3.6现场车辆行驶道路安排··············································6

施工准备····························································8

4.1技术准备··························································8

4.2现场准备··························································8

4.3搅拌站组织管理····················································14

混凝土计量搅拌和运输················································21

5.1混凝土计量························································21

5.2混凝土搅拌························································21

5.3混凝土运输························································21

混凝土浇筑、收面抹压和养护··········································22

6.1混凝土浇筑························································22

6.2混凝土收面抹压····················································28

6.3混凝土养护························································28

底板混凝土测温······················································29

7.1主楼底板测温点布置················································29

7.2车库地板测温点的布置··············································32

7.3传感器固定························································33

7.4配置计算机软件参数················································33

7.5底板混凝土养护测温················································33

底板混凝土工程试验··················································34

8.1现场混凝土标养室··················································34

8.2安排专职试验员····················································34

8.3混凝土坍落度测试··················································34

8.4混凝土试块留置、取样、养护········································34

质量保证措施························································35

9.1质量管理机构······················································35

9.2确保工程质量的管理措施············································35

9.3混凝土表面外观检查················································37

9.4混凝土的进场检验··················································37

安全措施····························································38

北京财富中心写字楼工程结构施工组织设计

4353.053301建施—5

4353.053301结施2—7~2—9

《建筑地基基础工程施工质量验收规范》

GB50202—2002

《混凝土外加剂应用技术规范》

《地下防水工程施工及验收规范》

《混凝土结构工程施工及验收规范》

《普通混凝土拌合物性能试验方法》

《组合钢模板技术规范》

《大体积混凝土施工规范》

《混凝土泵送施工技术规程》

《钢筋混凝土高层建筑结构设计施工规范》

《型钢混凝土组合技术规范》

《高层建筑混凝土结构技术规范》

《施工现场临时用电安全技术规范》

《粉煤灰在混凝土和砂浆中应用技术规范》

20 MWp光伏电站项目设备安装及电站运行调试施工组织设计.docx《普通混凝凝土配合比设计技术规程》

《建筑施工扣件式钢管脚手架安全技术规范》

《商品混凝土质量管理规程》

《混凝土矿物掺合料应用技术规程》

黄土隧道施工工艺方法《建筑工程施工及管理规范》

《混凝土外加剂应用技术规程》

《建筑安装工程质量检验评定统一标准》