标准规范下载简介
GB/T 40582-2021 水电站基本术语.pdfhanger 9.3.2.7 HCIM 7.2.1.5 head cover 5.2.3.7 head cover drainage system 8.3.5 head tank 4.6.2.2.4 head wall 4.6.1.37
GB/T405822021
.2.1./ 4.5.3.19 4.3.2.14
lapped insulation 6.8.9 largefluctuation 5. 1. 11 large screen display system 7.5.3 latchdevice 9.3.3.16 latent fault 10.1.4.6 lateral drawing gate 9.3.1.33 layered radiation DC power supply 7.4.2.13 layered water intake 4.5.2.6 layout of hydropower project 4.1.4 LCU 7.2.3.3 leading phase test
多边形地上十四层现代化建筑施工组织方案GB/T40582—2021
wall(roof)bushing 6.6.9.3 water column 9.2.5 waterconsumption 3.3.2.6 vater consumption ratio of generation 10.2.1.18 vater conveyance structure 4.2.7 vater conveyancesystem 4.6.2.2.6 vaterconveyancesystenm 4.6.2.2.13 water deficit .. 3.3.2.4 waterdemand
yearly energy consumed by pumping yield strength yoke
nsumedbypumping 2.4.10 9.2.17 5.3.3.3
3 breakers scheme