标准规范下载简介
NFPA 72-2019Shaded text = Revisions. = Text deletions and figure/table revisions. = Section deletions.N = New material
2019 Edition
Ahrens, M., "Home Structure Fires," NFPA Fire Analysis and Research Division, September 2016. Haynes, Hylton J.G., “Fire Loss in the United States during 2015," NFPA Fire Analysis and Research Division,September 2016. Injury Facts, National Safety Council, Itasca, IL, 2011.
GB 50352-2019 民用建筑设计统一标准A1.1.2.16.7 References to A.29.8.1
2019 Editior
NATIONAL EIRE ALARMAND SIGNALING CODS
NI.1.2.20 References Associated with Annex G
2019 Edition
NATIONAL EIRE ALARMAND SIGNALING CODS
ANSI/UL 2075, Gas and Vapor Detectors and Sensors, 2004 UL 9540, Outline of Investigatiom for Energy Storage Systems and Equipment, 1st edition, 2016. I.3 References for Extracts in Informational Sections. NFPA 70P, National Electrical Code, 2017 edition. NFPA 92, Standard for Smoke Control Systems, 2018 edition. NFPA 92B, Smoke Management Systems in Malls, Atria, and Large Spaces, 1995 edition. NFPA 101°, Life Safety Code, 2018 edition. NFPA 1221, Standard for the Installation, Maintenance, and Use of Emergency Seruices Communications Systems, 2016 edition
2019 Edition
2019 Edition
NATIONAL EIRE ALARMAND SIGNALING CODS
2019 Edition
NATIONAL EIRE ALARMAND SIGNALING CODS
2019 Edition
2019 Edition
NATIONAL EIRE ALARMAND SIGNALING CODS
2019 Edition
2019 Edition
NATIONAL EIRE ALARMAND SIGNALING CODS
2019 Edition
NATIONAL EIRE ALARMAND SIGNALING CODS
2019 Edition
2019 Edition
2019 Edition
NATIONAL EIRE ALARMAND SIGNALING CODS
2019 Edition
2019 Edition
NATIONAL EIRE ALARMAND SIGNALING CODS
2019 Edition
2019 Edition
NATIONAL EIRE ALARMAND SIGNALING CODS
2019 Edition
Inspection, testing, and maintenance personnel, see subhead: Service personnel Plans examiners and inspectors, 10.5.4 Public emergency alarm reporting system personnel, 10.5.6, 27.3.7, A.10.5.6.4.2(2), A.10.5.6.4.2(4) Service personnel, 10.5.3, 10.5.6.3, 14.2.3.6, A.10.5.3, A.14.2.3.6 Supervising station operators, 10.5.5, 26.2.9, A.10.5.5.1(2) System designer, 10.5.1, 10.5.6.1, 24.12.2 System installer, 10.5.2. 10.5.6.2
2019 Edition
NATIONAL EIRE ALARMAND SIGNALING CODS
2019 Edition
2019 Edition
NATIONAL EIRE ALARMAND SIGNALING CODS
2019 Edition
2019 Edition
NATIONAL EIRE ALARMAND SIGNALING CODS
2019 Edition
NATIONAL EIRE ALARMAND SIGNALING CODS
2019 Edition
Sequence of Events for the Standards
SequenceofEventsforthe Standards DevelopmentProcess
Once the current edition is published,a Standard is opened for PublicInput.
CommitteeMembership Classificationsl,2,3,4
The following classifications apply to Committee members and represent their principal interest in the activity of the Committee
SubmittingPublicInput/PublicCommentThroughtheOnlineSubmissionSystem
pegin your Public Input, select the link "The next edition of this standard is now open for Public Input" ted on the About tab, Current & Prior Editions tab, and the Next Edition tab. Alternatively, the Next Edit ncludes a link to Submit Public Input online
To submit a Public Comment you may access the online submission system utilizing the same s explained forthe submission of Public Input
OtherResourcesAvailableontheDocumentInformationPages
mationontheNFPAStandardsDevelopmentProce
acetoconnect onlinewithyourfire,electrical,andli
boutthecodeorstandardyou'reread
GB/T 25048-2019 金属材料 管 环拉伸试验方法NFPAXchangeTMcanhelp!
PAXchangeTmbringstogether over3O,oOOprofessionalsworldwide,askingandansweringea other's questions, sharing ideas, and discussing the issues impacting your industry today.
NFPAXchangeTMisfreetojoinandoffers:
DB34/T 1984-2013 公路交通应急宽带无线接入系统总体要求FPAmembersalsoenjoyXchangetMMembersOnly,theonlinespacefortechnicalquestions answeredbyNFPAstaff,exclusiveNFPAliveevents,andpremieraccesstocuratedcontent.
JoinNFPAXchangeTMTODAY!
Xchange Today. Safer Tomorrow