标准规范下载简介
CJJ 65-2004-T:市容环境卫生术语标准(无水印,带书签)htilever grabbing crane悬臂式抓斗起重机 5.2.5
chemical adsorption
cityappearancemanagement市容管理3.0.
DB11/T 1591-2018 城市道路日常养护作业规程closure of landfill填埋场封场 6.1.58
daily cover 日覆盖6.1.41
ed sludge脱水污泥 2.4.12
ironmentalsanitationadministration环境卫生管理7.2.11
facade 立面 3.0.11
烟气净化系统6.2.74
flue gas cooling facility
luidized bed incinerator流化床梦烧炉5.7.10
idizedbedpyrolysisoven单塔流化床热解炉5.7.
flyash solidification
ercrusher锤式破碎机5.4.
handling 处理3.0.37
HCl corrosion
heavymetalpollution重金属污染6.7.37
rizontal digester
zontalrotarydigester卧式回旋发酵装置5.7.3
seholdgarbage
humification腐殖质化6.4.68 humification index (HI) 腐殖质指数6.4.69 humus 腐殖质6.4.67
igniter点火装置5.7.22 impermeablemateriallayer防渗材料层 6.1.49 incineration 焚烧6.2.1
ationbuilding焚烧工房6.2.73
nducedaeration
inoculum(pl.Inocula)接种剂6.4.55
pit (latrine)
便无害化处理6.5.2
粪便低稀释法6.5.16
nightsoil sewagefrom ships operation system
pyrolytic oil
safe landfill
efusecollection
sourcereduction源头减量3.0.31
special refuse
abilizationperiod
te阶梯式炉排5.7.17
mporary lavatory
le cleaning station
total suspendedparticulate总悬浮微粒(TSP)
toxic waste 有毒废物 2.1.9
vector病媒(带菌体)6.4.71
waste gas burner
ter area environmental sanitation
water quality monitoring
zymosis 发酵6.4.41
水洗除臭法6.7.28
飞灰固化flyashsolidification
DB1310/T 257-2021 隧道锚杆台车通用技术规范.pdf焚烧工房incinerationbuilding6.2.73
粪便好氧消化处理nightsoilaerobicdigestion
更清运量nightsoiltransferquantity6.5.3
粪便作业系统nightsoil operation system
早厕所latrine;latrine pit;pit privy4.3.3
空气污染指数AirPollutionIndex(API)
飘尘floatingdust6.7.33
污泥浓缩sludgeconcentration 2.4.3 污染监视井pollution surveillance well 3.0.86 污染扩散井pollution diffusion well 3.0.85
YD/T 1591-2021 移动通信终端电源适配器及充电/数据接口技术要求和测试方法.pdf统一书号:15112·11823