深圳西部通道填海及地基处理工程施工组织设计方案

深圳西部通道填海及地基处理工程施工组织设计方案
仅供个人学习
反馈
文件类型:.zip解压后doc
资源大小:111.21K
标准类别:施工组织设计
资源属性:
下载资源

施工组织设计下载简介

内容预览随机截取了部分,仅供参考,下载文档齐全完整

深圳西部通道填海及地基处理工程施工组织设计方案

深圳西部通道填海及地基处理工程

中国第一冶金建设公司深圳分公司

一、施工组织设计··················································1

1编制依据······················································1

[北京]少年宫定型钢模、木胶合板模板施工方案2工程概况······················································2

3施工部署······················································5

4本工程的关键工序及采取的相应技术措施··························7

5主要工程项目的施工方案、施工方法······························8

5.1场地平整、清理············································8

5.2隔堤强夯挤淤··············································8

5.3伏堤振冲碎石桩施工········································9

5.4土工布铺设···············································10

5.5砂垫层施工··············································10

5.6盲沟、集水井施工········································10

5.7塑料插板施工············································11

5.8底基层填筑··············································12

5.9堆载施工················································13

5.10施工质量监测···········································13

6拟投入的主要施工机械设备、劳动力进场计划·····················14

7施工进度计划·················································15

8施工总平面规划···············································16

9确保工程质量的技术组织措施···································17

附图表一:质量检查组织机构图·································22

附图表二:用于质检的仪器、设备表·····························23

附图表三:质量保证体系框图···································24

10确保安全生产的技术组织措施··································25

11确保文明施工的技术组织措施··································27

12确保工期的技术组织措施······································28

13雨季施工技术措施············································29

14环境保护技术组织措施········································30

15地上地下设施的保护加固措施··································30

16服从业主、监理工程师全过程管理保证措施······················31

表8.1拟投入的主要施工机械设备表······························32

表8.2劳动力计划表············································33

表8.3计划开、竣工日期和施工进度网络图························34

表8.4施工总平面布置图及临时用地表····························36

二、项目管理班子配备情况·······································37

表8.5项目管理班子配备情况表··································37

表8.6项目经理简历表··········································38

表8.7项目技术负责人简历表····································40

DB34/T 1547-2018标准下载表8.8项目管理班子配备情况辅助说明资料························41

三、项目拟分包情况··············································67

表8.9项目拟分包情况表········································67

工程名称:西部通道填海及地基处理工程(第5合同段)

投标文件内容:技术标投标文件

投标人:中国第一冶金建设公司深圳分公司

日期:2002年9月26日

一、施工组织设计或施工方案

煤棚施工组织方案二、项目管理班子配备情况