施工组织设计下载简介
内容预览随机截取了部分,仅供参考,下载文档齐全完整
北京财富中心大体积砼施工方案编制依据····························································1
1.1施工组织设计······················································1
1.2施工图····························································1
中国银行施工组织设计1.3施工规程、规范····················································1
1.4主要标准··························································2
1.5主要标准图集······················································2
1.6其他······························································2
工程简介····························································3
2.1工程位置及周边环境················································3
2.2设计简介··························································3
2.3重点与难点························································5
施工安排····························································6
3.1施工计划安排······················································6
3.2成立协调指挥中心··················································6
3.3选择商品混凝土搅拌站··············································6
3.4混凝土浇筑顺序····················································6
3.5混凝土输送方式····················································6
3.6现场车辆行驶道路安排··············································6
施工准备····························································8
4.1技术准备··························································8
4.2现场准备··························································8
4.3搅拌站组织管理····················································14
混凝土计量搅拌和运输················································21
5.1混凝土计量························································21
5.2混凝土搅拌························································21
5.3混凝土运输························································21
混凝土浇筑、收面抹压和养护··········································22
6.1混凝土浇筑························································22
6.2混凝土收面抹压····················································28
6.3混凝土养护························································28
底板混凝土测温······················································29
7.1主楼底板测温点布置················································29
7.2车库地板测温点的布置··············································32
7.3传感器固定························································33
7.4配置计算机软件参数················································33
7.5底板混凝土养护测温················································33
底板混凝土工程试验··················································34
8.1现场混凝土标养室··················································34
8.2安排专职试验员····················································34
8.3混凝土坍落度测试··················································34
8.4混凝土试块留置、取样、养护········································34
质量保证措施························································35
9.1质量管理机构······················································35
9.2确保工程质量的管理措施············································35
9.3混凝土表面外观检查················································37
9.4混凝土的进场检验··················································37
安全措施····························································38
北京财富中心写字楼工程结构施工组织设计
4353.053301建施—5
4353.053301结施2—7~2—9
《建筑地基基础工程施工质量验收规范》
GB50202—2002
《混凝土外加剂应用技术规范》
《地下防水工程施工及验收规范》
《混凝土结构工程施工及验收规范》
《普通混凝土拌合物性能试验方法》
《组合钢模板技术规范》
《大体积混凝土施工规范》
《混凝土泵送施工技术规程》
《钢筋混凝土高层建筑结构设计施工规范》
《型钢混凝土组合技术规范》
《高层建筑混凝土结构技术规范》
《施工现场临时用电安全技术规范》
《粉煤灰在混凝土和砂浆中应用技术规范》
20 MWp光伏电站项目设备安装及电站运行调试施工组织设计.docx《普通混凝凝土配合比设计技术规程》
《建筑施工扣件式钢管脚手架安全技术规范》
《商品混凝土质量管理规程》
《混凝土矿物掺合料应用技术规程》
黄土隧道施工工艺方法《建筑工程施工及管理规范》
《混凝土外加剂应用技术规程》
《建筑安装工程质量检验评定统一标准》