标准规范下载简介
parker接头样本Parker Hannifin Corporation Tube Fittings Division Columbu
Catalog4300 PartData
MaleBSPwithEOlasticSeal/EOTubeEnc
GB/T51380-2019 宽带光纤接入工程技术标准及条文说明Alldimensionsareinmillimeters
Parker Hannifin Corporation Tube Fittings Division Columbu
Catalog4300 PartData
MaleMetricwithEOlasticSeal/EOTubeEnc
Alldimensionsareinmillimeters
Parker Hannifin Corporation Tube Fittings Division Columbu
Catalog4300 PartData
BSPFemaleThread/BSPFemaleThread
Alldimensionsareinmillimeters
Parker Hannifin Corporation Tube Fittings Division Columbu
Catalog4300 Part Datal
CartridgeValve
Alldimensionsareinmilimeters
RVP in drllled hole
Parker Hannifin Corporation Tube Fittings Division Columbi Ohio
Catalog4300 Part Datal
nternalParts
Alldimensions areinmillimeters
Standard: Material steel zinc plated (A3K),springsphosphatedand oiled.Packing disc o NBR (e.g.,buna N), opening pressure 1 bar.
Parker Hannifin Corporation Tube Fittings Division Columbi .Ohio
Catalog4300 Part Datal
Cutting Locking Ring
Cutting/locking rings, series LL: zinc plated and yellow chromated (A3C) Progressive rings, series L and S: zinc plated and olive chromated (A3D) NOTE:DPRProgressive rings in sizes6,8,10 and12mmarethe same for both L and S series.
PRProgressiveringsinsizes6,8,10and12mmar ameforbothLandSseries.
Catalog4300 Part Datal
All dimensions in millimeters
Catalog4300 Part Datal
BulkheadLocknut
All dimensions in millimeter
Catalog4300 Part Datal
All dimensions in millmeters.
ReplacesBUZ Assembly instructions as per swivel nuts (see page H10, step 13) VKA6to12are suitableforseriesLandS. Mnutnot included
Parker Hannifin Corporation Tube Fittings Division Columbi .Ohio
Catalog4300 Part Datal
Metric Tube End
All dimensions in millimeters!
Dimensions given are approx. figures with tightened nut
Parker Hannifin Corporation Tube Fittings Division Columbu
Catalog4300 Part Datal
All dimensions in millimeter
Catalog4300 Part Datal
All dimensions in millimeters
AssemblyinstructionsseepagesH12andH13 VHreplaces VSH
Catalog4300 Part Datal
Sealing Rings for Banjo Fittings WH/TH and SWVE
Sealing Rings for Pressure Gauge Connectors
Sealing Rings for Pressure Gauge Connectors DKI
Catalog4300 Part Datal
EOlastic Soft Seal for BSPP & MetricThreads
All dimensions in millimeters!
SpiralRingsforUseinDVGE/DWE
All dimensions in millimeters
elating spiral ring sizes to fittings, see pages Hg9 and
for for Standard male male Material metric thread From Stock Part no. thread BSPP D S NBR FPM ED8X1X M8 × 1 9.9 6.5 ED10X1X M10 x 1 G 1/8 A 11.9 8.4 ED12X1.5X M12 x 1.5 14.4 9.8 1.5 ED14X1.5X M14 x 1.5 G 1/4 A 16.5 11.6 1.5 ED16X1.5X M16 x 1.5 18.9 13.8 1.5 ED3/8X G 3/8 A 18.9 14.7 1.5 ED18X1.5X M18 × 1.5 20.9 15.7 1.5 ED20X1.5X M20 x 1.5 22.9 17.8 1.5 ED1/2X G 1/2 A 23.9 18.5 1.5 ED22X1.5X M22 x 1.5 24.3 19.6 1.5 ED26X1.5X M26 x 1.5 G 3/4 A 29.2 23.9 1.5 . ED26X1.5X M27 × 2 G 3/4 A 29.2 23.9 1.5 ED33X2X M33 × 2 G 1A 35.7 29.7 2 . ED42X2X M42 × 2 G 1 1/4 A 45.8 38.8 2 . ED48X2X M48 × 2 G 1 1/2 A 50.7 44.7 2
Catalog4300 Part Datal
Material: NBR (e.g., buna N), on request FPM (e.g., Viton) or special
Material: NBR (e.g., buna N), on request FPM (e.g., Viton) or special
Parker Hannifin Corporation Tube Fittings Division Columbu
Catalog4300 Part Datal
MetricTubeEnd/MetricTubeEnd
Parker Hannifin Corporation Tube Fittings Division Columbu
Catalog4300 Part Datal
MetricTubeEnd/MetricTubeEnd
Catalog4300 Part Datal
HighPressureValve
MetricTubeEnd/MetricTubeEnd with internal threaded spindle and body of lowgradeforged stainless steel
MetricTubeEnd/MetricTubeEnd
Catalog4300 Part Datal
HighPressureValve
MetricTubeEnd/MetricTubeEnd with external threaded spindle and body offorged stainless steel
MetricTubeEnd/MetricTubeEnd
Catalog4300 Part Datal
Alternating Valve
Metric Tube End All 3 ends
Catalog4300 Part Datal
FemaleBSPThread/FemaleBSPThread
Parker Hannifin Corporation Tube Fittings Division Columbu
Catalog4300 Part Datal
MetricTubeEnd/Metric TubeEnd
All dimensions in millimeters.
Parker Hannifin Corporation Tube Fittings Division Columbu
Catalog4300 Part Datal
All dimensions in millmeters.
Catalog4300 Part Datal
CECS 546-2018-T 钢管混凝土束结构技术标准TestPointConnectorwithM16X2Threaded
Metric Tube End/MetricTube End
Alldimensions in millimeters
Parker Hannifin Corporation Tube Fittings Division Columbu
JC/T 2069-2011 中空玻璃间隔条 第1部分:铝间隔条Catalog4300 Part Datal
TestPointConnectorwithM16
All dimensions inmillimeters