标准规范下载简介
【京】11BS3:给水工程.pdf对焊式双面衬塑钢管结构图丫国海对焊连接外层PE钢管不锈钢管外层PE钢管不锈钢管PE热缩套不锈钢管钢管内村PE管2内衬PE管焊接焊接焊接注:1.对焊式及面衬塑钢管是在锅管两端分别焊上一定长度的不锈钢管材,将与热熔胶共挤成型的塑料管装入钢管中,加热加压使塑料管粘在钢管内壁,然后再在钢管外表面覆上一层热熔胶和塑料共挤外防腐层的衬型辆管。2.管材公称压力1.6MPa、2.5MP,适用于中低压埋地长输给水管线。3.管材的线膨胀系数为0.012mm/m·K。4.本材料标准长度一般为6m、12m。5.根据成都贝根管道有限公司提供的技术资料编制。图集号图名对焊式双面衬塑钢管连接11BS3页次273
1.6MPa产品规格尺寸及允差(mm)复合管铜管外塑层不圆度人DN长度外径》健厚》外径》无差壁厚》最小厚度制4049.53.848.0± 0.501.03.90.85061.660.065.77.476.01.53.91.11.21.2 6000 ± 208090.54.589.012000±5032100115.75.1114.32.01.31.8供货有特125141.45.4140.02.21.42.2人殊要求时150169.66.3168.3± 1.0%2.51.52.5长度可由审200220.97.0219.13.02.03.5供蓄友方250274.28.0273.03.54.0协商确定300325.08.5323.93.8350356.49.2355.64.02.25.0 1400406.79.7406.44.5例编2.5MPa产品规格尺寸及允差(mm)复合管钢管DN外塑层不圆度外径》长度外径》壁厚2允差壁摩》最小厚度4049.54.148.0± 0.501.060.00.85061.64.2654.276.01.81.177.48090.54.889.01.21.2 6000±201.812000 ± 50100115.75.8114.32.71.3供货有特125141,46.3140.03.11.42.2殊要求时150169.67.C168.3± 1.0%3.51.52.5长度可由200220.98.0219.14.02.03.5供蓄双方250274.29.0273.04.54.0协商确定300325.09.4323.94.7350356.4°0.3355.65.12.25.0 400406.710.7406.45.5图集号图名11BS3对焊式双面衬塑钢管规格页次274
Y国峰固定接头式钢丝网骨架塑料(聚乙烯)复合管结构图钢丝网骨架塑料复合管围定接头固定接头式钢丝网骨架塑料(聚乙烯)复合管规格尺寸公称外径(dn)/mm公称压力/MPa0.81.01.251.62.02.53.5基本尺寸极限偏差公称壁厚en及极限倡差mm75*125.0*,25.0*125.5*56.0*j5905.5*155.5*155.5*156.0*15人1105.5*155.5*157.0*157.0*t57.5*1.58.5*151405.5*55.5*158.0*158.5*159.0159.5*151606.0*156.0*59.01,59.5*1510.0 *2010.5*202006.0*156.0*59.51510.5 *2.011.0 *2012.5*22250+2.58.0*1510.5 *2.010.5 *2.012.0*2212.0*2.212.5*2注:1.固定接头式钢丝网骨架塑料(聚乙烯)复合管是在钢丝网骨架塑料(聚乙烯)复合管材两端,采用注塑成型工艺,使用与管材相同的原料将固定头与管材注复合为一体的管材。2.管材的线膨胀系数为0.20mm/m·K。3.管材适用于城镇供水,建筑给水,长距高给水输送和消防给水管道系统。4.本材料标准长度为6m、12m。5.本页根据成都贝根管道有限公司提供的技术资料编制。固定接头式钢丝网骨架塑料图集号11BS3图(聚乙烯)复合管规格页次276
2.2固定头连接面上的污物应使用洁净棉布操争,并铣削连接 面,使其与轴线垂直。 2.3待连接件的断面用加热板加热。 2.4当加热结束,加热板应迅速脱离连接件,并用均匀压力使 连接面完全接触,并翻逆,在管外形成均匀一致的凸缘, 凸缘的高度和宽度应特合有关规定。 2.5在热熔连接及冷却过程中,不得移动、转动接头部位及两 侧管道,不得在连接部位和管道上施加任何外力。 3.埋地销设见第261页。
法兰连接(电熔法兰连接件与金属管件)法兰连接(注塑固定头连接件与金属管件)丫国海Fr金属管管道阳件金属法兰密封胶垫朝制松套法兰电熔法兰连接件复合管注塑围定头连接件钢制对半活法兰密封胶垫金属管管道附件金属法兰法兰连接(电熔法兰连接件)法兰连接(注重固定头连接件)紧固螺栓密封胶垫钢制松套法兰电熔法兰连接件复合管聚固螺检密对胶垫钢制对半活法兰注塑固定头连接件复合管注:1.两法兰盘螺孔应对中,法兰面相互平行,螺孔直径应配套,螺检长度应一致,螺幅应在间一侧;累围法兰盘上螺栓时应按对秘顾序分次均匀紧固DL/T 943-2015 烟气湿法脱硫用石灰石粉反应速率的测定,螺栓行累后宜伸出螺帽1~3丝扣。2.钢制法兰盘及其紧固件应采取防腐措施。钢丝网骨架塑料(聚乙烯)图集号11BS3图名复合管连接(二)页次278
搭接焊式铝塑管结构图
对接焊铝型复合管基本结构尺寸(mm)
对接焊式铝塑管结构图
搭接焊铝塑复合管基本结构尺寸(mm)
铝塑管密封胶圈垫片直通本体铝塑告密封胶围垫片活接头本体铝塑管套筒(压紧前)套筒(压紧后)直通连接活接头连接注:铝塑管1.铝塑管与卡压式管件连接步骤:金属管或内丝直通本体铝塑管管件或器具接口外丝直通本体将铝塑管口端部擦指干净;采用专用整器具接口圆扩口器或绞刀将管口端部整圆扩口:采用专用压紧工具压紧管件套筒。2.卡压式管件压案后,不可拆卸。3.卡压式管件金属部件材料为不锈钢。内丝直通连接外丝直通连接图集号11BS3图名铝塑管卡压式接头安装页次281
!卡套密封胶垫片垫片管件或器具接口外丝直通本体垫片铝塑管丫国降铝塑管螺帽(柠紧前)直通头部直通本体螺帽(拧案后)外丝直通连接直通连接注:1.卡套式接头适用于dn≤32的管道连接。管件或器具接口内丝直通本体垫片铝塑管2.铝塑管与卡套式管件连接步骤:将铝塑管口端部募措干净,采用专用整圆扩口等或绞刀将管口端部整圆扩口,将卡套套入铝塑管端部;将铝塑管插入管接头头部,拧紧接头连接螺帽。3.卡套式管件拧紧后可以拆卸。但整垫圈与管件在一起,不能拆分。4.卡套式管件金属部件材料为黄铜或不锈钢。内丝直通连接图铝塑管卡套式接头安装号11BS3名页次282
表1 不同饱和蒸汽压力的温度与灶
B1FGVL、B2FGVL型立式汽一水半容积式水加热器选用表(被加热水出水温度为60'C)Y国序罐体罐体换热产热水量Q(kg/h)饱和蒸汽耗量G(kg/h)产热量Qg(kw)型号直径容积面积制DNP, =0.1MPgP, =0.2MPoP, =0.3MPoP, =0.4MPaFP, =0.1MPd P, =0.2MPd P; =0.3MPd P, =0.4MPq P, =0.1MPg P, 0.2MPd P, =0.3MPd P, =0.4MP(mm)(m3 )(m²)(120.2C)(133.5'C)(143.6C)(151.9°C)(120.2C)(133.5°C)(143.6C)(151.9'C)(120.2C)(133.5'C)(143.6C)(151.9°C)B1/2FGVL 9009002.54713.95258.15671.46011.0442.0489.4525.1554.3301.5336.3362.8384.5526:.35926.46431.56846.6403.7451.3487.2516.6275.4,310.2336.6358.3B1/2FGVL10000001.53.97353.68202.68847.39377.1689.6763.4819.1864.7470.4524.7565.9599.88207.69245.210033.210680.8629.7704.0760.0805.8429.648.3.9525.1559.05.19616.310726.511569.612262.4901.8998.31071.221130.8615.1686.2740.1784.43 BvFGVL120010733.012089.913120.313967.823.5920.61200993.91053.8561.7632.8686.7731.010992.712261.813225.64017.62.55.83030.91141.21224.51292.6703.2784.4846.0896.712269.213820.14998.315966.4941.41052.41136.1204.6642.1723.3785.0835.63.010992.712261.813225.614017.610.30.95.831141.21224.51292.6703.2784.4846.0896.712269.23820.414998.315966.4941.41052.41136.1204,6642.1723.3785.0835.6Br/FGVL140014003.57.794688.416384.27671.918730.21377.41524.91636.21727.2939.61048.11130.4198.116394.18466.720040.721334.1257.91406.21518.1609.6858.0966.51048.91116.64.09.3417611.019644.221188.222457.01651.51828.31961.72070.91126.51256.61355.41436.:19656.122141.24028.225579.01508.11686.01820.31929.91028.71158.81257.6* $ 8.74.011.6922042.024586.826519.328107.32067.02288.32455.32591.91410.01572.81696.41798.024601.6j27711.930073.932014.91887.62110.22278.12415.5*287.61450.41574.01675.65B1/2FGVL 160016004.514.0126416.429466.231782.333685.52477.22742.52942.63106.31689.81884.92033.02154.829484.133211.636042.338368.52262.22529.02730.32894.81543.11738.21886.42008.15.0 15.5229263.632642.135207.837316.22744.23038.13259.73441.11871.92088.12252.22387.032661.936791.239927.042503.92506.02801.63024.53206.81709.4925.62089.72224.55.011.6922042.024586.826519.328107.32067.02288.32455.32591.91410.01572.81696.4798.024601.627711.930073.932014.91887.62110.22278.2415.51287.61450.41574.01675.6Bs/2"GVL 180018006.026416.429466.231782.333685.514.012477.212742.52942.63106.31689.81854.92033.02154.829484.133211.636042.338368.52262.22529.02730.32894.81543.1:738.21886.42008.17.015.5229263.632642.135207.837316.22744.23038.3259.7344T.11871.92088.12252.22387.032661.936791.239927.042503.92506.02801.63024.53206.81709.4*925.62089.72224.57.0*5.5229263.632642.135207.837316.22744.23038.13259.73441.11871.92088.12252.22387.032661.936791.239927.042503.92506.02801.63024.53206.81709.41925.62089.72224.5B/^FGVL 200020008.016.3530828.634387.837090.739311.82891.03200.53434.03625.11972.02199.72372.62514.79.034408.638758.842062.244777.02640.02951.53186.33378.31800.92028.52201.42343.510.0:9.6036956.641223.344463.447126.13465.73836.74116.64345.72364.050423.22637.02844.23014.641248.246463.153677.63:64.835.38.13819.64049.92158.82431.82639.02809.4注:1.表中数据上列为进水温度5'C,下列为进水温度15'C浮动盘管立式汽一水图图集号名11BS32.尚有部分规格未全部列出,请参阅产品本。半容积式水加热器选用表页294
BFGVW型卧式汽一水半容积式水加热器选用表(被加热水出水温度为60'C)YE罐体罐体换热序产热水量Q(kg/h)饱和蒸汽耗量G(kg/h)产热量Og(kw)制型号直径容积面积DNVP, =0.1MPoP, =0.2MPaP, =0.3MPoP, =0.4MPP, =0.1MPdP, =0.2MPo|P, =0.3MPdP, =0.4MPoP, =0.1MPdP, =0.2MPcP, =0.3MPdP, =0.4MPa号(mm)(ms ):(m² )(120.2°C)(133.5°C)(143.6°C)(151.9°C)(120.2C)(133.5'C)(143.6°C)(151.9'C)(120.2C)(133.5'C)(143.6°C)(151.9"C)2.54713.95258.15671.46011.0442.0489.4525.554.3301.5336.3362.8384.510005261.35926.46431.56846.6403.7451.3487.2516.5275.4310.2336.6358.3BFGWW10007353.68202.68847.39377.1689.6763.4819.1864.7470.4524.7565.93.9599.81.58207.69245.210033.210680.8629.7704.0760.0805.8429.6483.9525.1559.09616.310726.511569.62262.4901.8998.31071.21130.8615.1686.2740.784.425.12BFGW1200j120010733.012089.913120.313967.1823.5920.6993.91053.8561.7632.8686.7731.00992.72261.813225.64017.6030.9141.21224.5292.6703.2784.4846.0896.72.55.8312269.213820.414998.315966.4941.41052.41136.1204.6642.1723.3785.0835.610992.712261.813225.614017.63.05.831030.91141.21224.51292.6703.2784.4846.0896.712269.213820.414998.315966.4941.41052.41136.11204.6642.1723.3785.0835.614003.5 3BFGVW 14007.7914688.416384.217671.918730.21377.41524.91636.2727.2939.61048.1130.41198.14.016394.18466.720040.721334.1257.91406.21518.11609.6858.0966.51048.91116.69.3417611.019644.221188.222457.01651.54.51828.31961.72070.9126.51256.61355.41436.519656.122141.124028.225579.01508.11686.01820.21929.91028.71158.81257.61338.74.011.6922042.024586.826519.328107.32067.02288.32455.32591.91410.01572.81696.41798.04BFGVW16004.52460:.627711.930073.932014.91887.62110.22278.12415.51287.61450.41574.01675.6160014.0126416.429466.231782.333685.52477.22742.52942.63106.31689.81884.92033.02154.85.029484.133211.636042.338368.52262.22529.02730.32894.81543.11738.21886.42008.122042.024586.826519.328107.32067.02288.32455.35.011.692591.91410.01572.81696.41798.024601.627711.930073.932014.91887.62110.22278.12415.51287.61450.41574.01675.626416.429466.231782.333685.52477.22742.52942.63106.3180014.011689.8884.92033.02154.85BFGVW18006.029484.133211.636042.338368.52262.22529.02730.32894.81543.11738.21886.42008.17.015.5229263.632642.135207.837316.22744.23038.13259.73441.11871.92088.12252.22387.032661.936791.239927.042503.92506.02801.63024.53206.81709.41925.62089.72224.57.015.5229263.632642.135207.837316.22744.23038.13259.73441,11871.92088.12252.22387.032661.936791.239927.042503.92506.02801.63024.53206.81709.41925.62089.72224.56BFGVW200020008.016.3530828.634387.837090.739311.82891.03200.53434.03625.11972.02199.72372.62514.79.034408.638758.842062.244777.02640.02951.53186.33378.31800.92028.52201.42343.510.019.6036956.641223.344463.447126.13465.73836.74116.64345.72364.02637.02844.23014.641248.246463.150423.253677.63164.83538.13819.64049.92158.82431.82639.02809.4注:1.表中数据上列为进水渠度5'C,下列为进水温度15C:浮动盘管卧式汽一水图集号图11BS32.尚有部分规格未全部列出,请参闵产品样本。名半容积式水加热器选用表页次296
人B2FGVL型立式半容积式水加热器72X文B2FGVL型立式半容积式水加热器膨胀罐文丫净热水国水管8XX9OX热水回水管文OSNC凝结水回水(重力排放)管OSNO,热水回水管XB2FGVL型立式汽一水半容积式水加热器系统原理图B2FGVL型立式水一水半容积式水加热器系统原理图单台水加热器单台水加热器注:1.由市政给水管直接供水且在引入管上无防回流设施时,图例应在冷水给水管上装倒流防止器。图例名称图例名称图例名称2.对水加热器出水温度的稳定要求较高时,若采用的温控阀为两通阅,可采取加分流管的措施。阀门安全阀热电偶止回阀排污阀Y型过滤器院太阀水泵介质流向浮动盘管B2型立式半容积式1图集号11BS3图名温度调节阀压力表水加热器系统原理图页次302
TGTL、TGTW型立卧式水一水半即热式水加热器选用表(被加热水出水温度为5O'C)Y国I序换热产热水量Q(kg/h)热煤耗量G(kg/h)产热水量Qg(kw)型号面积号热煤水初温/终温('C/C)热煤水初温/终温('C/C)热煤水初温/终温('C/C)(m²)70/5095/70110/8070/5095/70110/8070/5095/70110/80723.9 3223.05686.17027.7251.80235.010541.668.7297.6367.83602.96698.48396.66305.19377.79796.0146.7272.7341.8TGT4005.14214.77435.79190.19483.213384.313785.2220.68759.410980.18245.2389.24711.512810.2191.8356.7481.0w12263.210451.5447.05.84793.28456.30784.815221.315677.3250.95358.29961.79376.8442.6547.012487.213946.414568.4218.1405.5508.36.45289.19331.11532.711900.516795.917299.1276.85912.510992.213779.010346.9488.4240.7603.615389.116075.5447.5560.9TGT5007.46115.510789.113334.713759.919420.320002.16836.312709.7320.11963.618587.3278.3564.7697.915932.017793.6372.05*7.4648.58.67107.212538.615497.5991.222569.518515.513903.623245.67944.914770.820679.1323.4656.2601.3811.121601.4753.78.26776.71955.414776.315247.521519.822164.4354.7625.77575.414083.813256.9773.416938.717654.319717.320596.7308.4573.3718.79.47768.413705.017478.824669.025408.0406.68684.015196.923610.9717.3886.53TGT L60016144.820237.922602.7353.5657.2823.8w11.19173.316183.620002.20639.929130.530003.1480.1847.01046.910254.519064.623897.917945.318516.426690.527880.9417.4776.1972.812.710495.522885.223615.033329.434327.8549.3969.127342.720532.01197.81732.621812.718222.630537.726489.231899.8477.6887.91113.09.88098.914288.27659.525718.8423.9747.8924.39053.516831.821099.115843.623564.624615.6368.5685.2858.911.29255.916329.420182.320825.829392.910346.919236.424113.230273.4484.4854.61056.3TGTL70010908.818107.026930.928132.1421.2783.1981.613.219245.3W23786.224544.734641.635679.3570.91007.312194.527671.4496.41244.927029.828419.221340.436068.233155.7922.91156.915.012396.313857.421869.727891.72576.3.039365.540544,2648.81144.61414.732294.524250.436068.237676.9564.11048.71314.618.037674.426243.732435.833470.047238.648653.6778.61373.516628.91967.617437.530915.638753.429100.543281.845212.3676.91258.51577.5TGT80021.130763.438021.939234.355374.57032.9912.619492.734:12.31610.1990.034262.536240.045427.650735.952998.9793.51475.21849.223.519420.942346.743697.061672.66.3520.0*016.421709.91793.22216.340362.050594.737992.456506.959027.2883.71643.02059.5注:表中数据上列为进水温度5'C,下列为进水温度15'C。浮动盘管立卧式水一水图集号11BS3图名半即热式水加热器选用表页次305
热水出管温度表接管D4压力表接管M27x2G1/2"Y国牌电磁阀接口TGTL型立式半即热式水加热器尺寸表安全阀(mm)温包接管序号型号DD1D2D3D4H自重(kg);运转重量(kg)1TGTL4003.95032(50)404020003555152TGTL4005.14005125032(50)40402300377537D3TGTL4005.85037(50)505025004045894TGTL5006.46532(65)505027505447845 :TGTL5007.45006126532(65)50502400576855oto6TGTL5008.66532(65)505026506189.36仪表箱D1.D2D7TGTL6008.26532(65)656522007901141?038TGTL6009.46532(65)6565240083412436001716丫海!9TGTL60011.18040(80)65652450895136110TGTL60012.78040(80)656526009461468I 1402011[TGTL7009.88040(80)656521809471441支座12TGTL70011.27008040(80)65652300100315741113 |TGTL70013.28168040(80)656524501082173014TGTL70015.010050(100)808026501146187115TGTL80018.010050(100)808026501334229716TGTL8002*.180091610050(100)808029001416248017TGTL80023.510050(100)8080300014902654注:1.水一水换热时D2选择括号内的数值。排污管冷水进管2.基础必须经结构专业设计计算。SN50D3冷凝出管3.运转重量=自重+介质重。热媒进管D1D2TGTL型立式半即热式水如热器外形图立面图浮动盘管立式半即热式图集号11BS3图水加热器外形尺寸页次306
Y国热煤水给水管慕汽管TGTW型卧式水一水半即热式水加热器TCTW型卧式汽一水半即热式水加热器32XHXX2分热煤水回水管影胀罐膨胀罐凝结水回水(重力排放)管专水给水管冷水给水管AX热水回水管热水圆水管TGTW型卧式水一水半即热式水加热器系统原理图TGTW型卧式汽一水半即热式水加热器系统原理图单台水加热器单台水加热器图例注:1.由市政给水管直接供水且在引入管上无防回流设施时,应在冷水给水管上装倒流防止器。图例名称图例名称图例名称2.对水加热器出水度的稳定要求较高时,若采用的温控阀门安全阀热电偶阀为两通阀,可采取加分流管的措施。止回间排污阀Y型过滤器疏水阀水泵介质流向图名浮动盘管卧式半即热式图集号11BS3温度调节阀压力表超温电磁阀水加热器系统原理图贾次309
安全阀B向AAB/2温包口d3d2ArA排污口2L2L3B2B1人型号换热面积净运行重量H1H2L112L3d1d2d3=d4B1B2B(m2)(kg)(kg)(mm)(mm)mm)(mm)(mm)kmm(mm)(mm)(mm)(mm)(mm)(mm)kmm)注:BBGVW10001.03,4,5139023902200600180|560501.d1、d2分别为热煤进出口。d3、BBGVW10001.56,7,81350580150030001.50285090018056050(32)509007401709.10d4分别为生活用水进出口。BBGVW12002.04,5,6219041902900|1100|200580702.表中尺寸视用户要求可以改动。BBGVW12002.57,8,92360486015506002103300130068070(40)7020010809001703.加热器安装间距为0.6~0.7m,检10,12,15修空间1.2m。BBGVW14003.05.6.7.8264556451750162230501100200680809,10,12290808012601050/1704.表中加热器净重和运行重量是尧程BBGVW14003.515,17,202980648034901300250720(50)压力为1.6MPa时所对应的重量。BBGVW16004.06,7.8,930807080742316513002006508010.12,15195032080801430|1180|2005.d2括号内尺寸为汽水换热器时尺寸。BBGVW16005.017.20,263600860035501500200650(50)BBGVW18006.07,8,9,1043301033037451300250700100BBGVW18007.012,15,172150114035039851500300100(50)10016001330|20020.26.30490011900700BBGVW20008.08,9,10,1215,17.205620136204600130025075010026,30,356215l162152350115401338051001500300750100(50)10017801490200BBGVW200010.040,45卧式波节管半容积式图集号11BS3名加热器安装图页次312
BBGVL(W)型立卧改节管半容积式加热毒汽水换热计算表
注:1.表中数据上列为进水温度5'C,下列为进水温度‘5'C。热水出口温度都为60'C 2.尚有部分规格未全部列出,请参阅产品样本。
2.尚有部分规格未全部列出,请参阅产品样本。
BBGVL(W)型立卧改节管半容积式加热器水水换热计其算表
注:1.表申数需上列为进水准度5'C,下列为进水漫度15C。 2.当热煤水彻温/终温为70/40C时,熟水出口温度为50°C;90/55C时,热水出口湿度为55C。 3.尚有部分规格未全部列出,请参阅产品样本。 波节管半容积式加热器 图集号 图名 11BS3 换热计算表 页 次 313
GS过滤型射频水处理器说明
全滤式综合水处理器选用表(强效型》
进水口丫国湾0出水口进水口出水口排污口mPoN排污口nPoNH全效型强效型图全滤式综合水处理器图集号11BS3外形图页次331
!Y国海进水口排污口PoN平面图立面图图名物化式综合水处理器图集号11BS3外形图次333
丫国峰3.2强效过滤型型号进出水管径适配系统单机处理设备外形尺寸(mm)净重(以A型为例)(mm)管径(mh)流量(mh)(T)iHWD50PLZH/1.050300及以下8~15175026006001120:.2WD70OPLZH/i1.07035015~ 252050270080012001.4WD80PLZH/11.08040020~ 3524002830100018701.6WD100PLZH/I1.010045030~ 5526503200120021302.0戏WD125PLZH/11.012550050~ 8531503400160024002.6WD150PLZH/I1.015060080~ 13036503600200029003.8WD200PLZH/1:.0200700130~22042003800250035006.2 WD250PLZH/I 1.0250800210~35048004000300041008.0如遇产品更新换代,设备规格有所变动,想不另行通知3.3安装位置示意循环系统主干管旁流管劳流式综合水处理器3.4安装要求基础要求:100mm高平整混凝土基础墙距要求:要求填距不小于500mm,便于设备检修4根据北京禹辉水处理技术有限公司提供的技术资料编制。图名旁流式综合水处理器图集号11BS3说明(二)页次335
出水口丫国峰进水口排污口工强效杀菌型出水口300 × 300工进水口排污口强效过滤型旁流式综合水处理器图集号11BS3图名外形图页次336
水系统自洁消毒器说明人1工作原理3.2 E型"水系统自洁消毒器"采用专利技术A、B两个处理器同时工作,在设杀菌率:>99.99%水头损失:0.005~0.03MPa各内采用事联工作方式,共同完成杀菌灭藻的功效。灭藻率:>99.95%工作环境要求:温度0~55℃漫度≤95%A处理器:防房功能:<0.125mm/年产品设计寿命:10年以上水流从入口进入A处理器,应用微电脑控制换能器中超低频电场的防垢除垢率:>95%处理水温要求:0~50℃能量。流经极板狭缝中的水流,瞬间被强力分解,水分子团被打裂、过滤精度达到:100μm打散、变小、重新排列在极板的两侧,分别形成带有不同电荷的高子4产品特点水:一种高氧化的还原电位的酸性水,一种带负高子的碱性水。含4.1既对流动水体中的菌藻杀灭,又对水箱(池)内壁附着的微有活体细菌病毒的水,在强电流构成的隙缝中凝流,其细胞分子在生物有剥离杀灭的作用。酸、碱变换的水流中死亡。由此达到对病菌强力的杀灭第一步作用。4.2不向水中投加任何物质。B处理器:4.3杀菌效果好,具有持续杀菌和抑菌抑藻作用。丫净B处理器产生高频脉冲电场,一方面利用高频脉冲波破环细胞的细4.4整体采用智能化控制,全自动方式运行,使用中无需专人管胞核,另一方面利用高压电场杀灭微生物;同时,利用高频脉冲波理,只需定期检。的传输性,对整个水系统中附着性菌藻类进行别离和杀灭。5注意事项2应用范围2.1型:适用于水系统中,水的储存、输送(可投加于管线中),5.1水系统自洁消毒器的进水管与水箱出水管上的预留管连接,是进行自冶杀菌灭藻的专用设备。见设备安装图。2.2Ⅱ型:适用于饮用水箱、水池、消防水池等大型净水存储容器的5.2在安装水系统自洁消毒器的水箱上预先留回水孔,其位置应保洁杀菌,应用于给排水系统,区别于1型是主机在水箱(池)避开水箱板折弯部位,并靠近水箱进水管。内使用。5.3水系统自洁消毒器与水箱的连接采用不锈钢或HDPE管连接。2.3Ⅱ型:主要适用于暖通、工业循环水、给排水系统,属于旁流型5.4打开与本设备连接的进出水阅门,当水进入本设备流量计时。水处理设备。在【、型的基础上增加了防腐、除、超净过滤接通220V主电源,使设备开始工作。功能,并且智能控制实现全自动排污,耐压性能达到≤1.6MPa。5.5厂家可根据用户提供的用水规律特点,设定水系统自洁消毒3技术参数器的工作程序,遇设备报警时通知生产厂。3.1「型、i型6根据北京禹辉水处理技术有限公司提供的技术资料编制。杀菌率:>99.99%产品设计寿命:10年以上灭藻率:>99.99%处理水温要求:0~50℃工作环境要求:温度0~55r湿度≤95%图名图集号水系统自洁消毒器说明11BS3页次337
进出水管丫国峰日日72指示灯口B正立面图侧立面图说明:紫外线消毒器选用表1.紫外线消毒器内安装有紫外线灯管,细菌在紫外线照射下致死,达到消毒目的。消毒水流量总功率设备尺寸(mm)2.适合条件:(1)原水水质浑浊度<5度,总含铁量<0.3mg/L,色度≤15度,型号大肠菌数≤1000个/L,细菌总数≤2000个/L。(m/h)(w)LBH(2)环境温度>5'C,空气中最大相对湿度≤90%(20+5'C):SZX1系列2 ~ 8≤2009602502803.主要技术参数:(1)崇外线灯管(40W新灯管)工作电源220V/50HZ。(2)进出水管口可按用户要求设计。SZX2系列15~ 25520960450480(3)工作压力≤0.6MPa,水头损失0.005MPo。SZX3系列30 ~ 6012009605009704.消毒特点:(1)杀毒快,无残留:(2)不改变原水的物理、化学性质。5.根据北京市海淀区智通水处理设备厂、北京水晶盛给排水设各厂、北京环智环保设备有限公司提供的技术资料编制。图名紫外线消毒器图集号11BS3页次342
5根据北京禹辉水处理技术有限公司提供的技术资料编售
TR系列软水器规格与技术参数表
注:1.对于产水量大于100m/h以上的规格,可根据用户要求另行设计 2.根据北京市特高换热设备厂提供的技术资料编制。
控例器出水管进水管控制器控制器出水管Y国峰OH进水管倒流防止器取样口挥水管排水排盐水盐水水管管盐离子交换器高子交换41离子交换器离子交换器管管管器混凝±200#盐箱盐箱盐箱丫停馨混凝土支墩C20立面图立面图墙排水出水管00进水管水出水管进水管件倒流防止器管排水沟排水沟盐水管盐水管离子交换器高子交换器盐箱高子交换器盐箱离子交换器盐箱LL平面图平面图TRB系列安装图TRC、TRD系列安装图图TR系列软水器安装图11BS3页次348
绝热说明 1概述 本图适用于输送介质温度为5~60'C的室内管道和设备的绝热工 程,对于热水是保温,对于冷水是防结幕。 绝热材料应根据使用条件、材料性能、经济性和耐久性等综合 因素来合理选择,且应为不燃烧材料或难燃烧材质。
「m:热层的内外表面温度的算术平均值。外表面温度取环境温度20'C,内表面
本图列出几种绝热材料在环境温度20C(室内计算混度)时的保温
热量损失,供设计选用参考。
单一电源最大热线长度Lmax(m)表 表 45
图名 图集号 118S3 绝热说明(五) 页次 353
面漆面漆乳化沥青或防水冷胶涂层不饱和聚酯树脂镀锌钢丝镀锌钢丝玻璃布玻璃布面漆乳化沥青或防水冷胶涂层不饱和聚酯树脂镀锌钢丝镀锌钢丝镀锌钢丝玻璃布玻璃布玻璃布三元乙丙橡胶防水卷材镀锌钢丝或胶带镁锌钢丝或胶带镀锌钢丝或胶带绝热层绝热层绝热层防锈漆二道防锈漆二道防锈漆二道管子管子管子丙型包扎保护层(1)玻璃布乳化沥青保护层(2)玻璃钢保护层(3)防水卷材保护层面漆(防火漆)镀锌钢丝压敏胶带玻璃布复合铝箔注:镀锌钢丝或胶带胶带1.保温结构(1)中,需待乳化沥青涂层干燥后,方绝热层绝热层可缠外层玻璃布。防锈漆二道防锈漆二道2.保温结构(2)中,玻璃钢表面涂面漆时,需待不管子管子饱和聚酯树脂固化后进行。3.(1)(2)(3)适用于地沟及湘湿环境,(4)(5)适用于室内架空管道。(4)玻璃布保护层(5)复合铝箔保护层图名图集号11BS3管道保温结构图(二)页次355
镀锌钢丝或胶带Y国降镀锌钢丝或胶带镀锌钢丝或胶带金属或玻璃金属或玻璃钢薄板保护层钢薄板保护层刷密封胶复合保护层绝热层抽芯铆钉或自攻螺钉抽芯铆钉或自攻螺钉绝热层绝热层弯头(甲型)三通(甲型)三通(乙型)镀锌钢丝或胶带注:1.甲型为金属或玻璃钢薄板保护层,乙型为复合保护层。2.弯头绝热层及金属或玻璃钢板保护层应按套管管径大小分节施工,保护层接缝应靠紧,不留续隙。绝热居复合保护层3.管道外皮防腐、保护层外皮防离与直管防离相同。弯头(乙型)图集号图名弯头、三通保温结构图11BS3次357
Y国降垫片金属保护层金属保护层钢带搭接钢带绝热层泡沫橡塑绝热层设备基础设备基础平壁设备平壁设各钢带结构泡沫橡塑结构注::.绝热层采用钢带绑扎结构,当设备高度大于2m时,每隔2~3m处焊支承板一周。当不允许直接焊于设备上时,应采用抱链支承件。外侧保护层采用金属薄板,也可祝工程具体情况,采用其他材质得保护层。2.采用泡沫橡塑绝热层结构时,在设备高度上不用设支承件,箱体外壁也不用设保温钩钉或销钉,使用专用胶水黏贴。3.泡沫橡塑绝热层外侧不用设防潮层,如果没有美观要求,保护层也可不设。4,如设备底部需要数设绝热层时,可采用侧壁同样得做法数设。图集号平壁设备保温结构图(二)11BS3图名页次362
DB35/T 1855-2019 剩余电流动作保护器检测规程玻璃棉制品绝热层经济厚度选用表 (mm)
惜水膨胀珍珠岩制品绝热层经济厚度选用表 (m
硅酸铝棉制品绝热层经济厚度选用表(mm)Y国海公称直径DN(mm)1520253240506580100125150200250300平面Q$Q15Q 300管道外径Do(mm)2727323845577689114133159219273325(W/m2)/=全年6060270707080808090909010010010012016.114.615.46024606060607070707080808090909011017.514.617.3401650505050606060607070707080809021.218.419.7200840404040404050505050505060606031.124.226.9/8=全年70707070808080909010010010011011013014.912.013.8602460606070707080808090909010010012016.114.615.44016505050606060607070707080使80809021.218.419.7200840404040505050505050606060607026.924.226.9r9/%/8=1d全年1001101101201201301301401501501601701801802507.97.77.76024901001001001101101201301301401401501601602208.98.88.94016808090909010010011011012012013014014018010.910.210.42008606070707080808090909010010010012016.114.615.4注:To=60°CTa=20°Cds =11.63W/m2.*C^ =0.050W/m.'C硅酸铝棉制品绝热层图名图集号11BS3经济厚度选用表页次369
管道防结露厚度表() (mm)
尾将191Y国海电源接线金二通接线盒法兰绝热层旁通温度传感器阀体h扎带TU钢带扎带电热带/管递三通接线盒接地管道尾端铝箔胶带电热带系统在管道上安装示意图保护屋保护层防潮层绝热层防潮层管道绝热层电热带扎带管道最大距离电热带300~500mm注:管道电热带安装位置图1.绝热层权质和厚度,防潮层和保护层做法由选用者决定。电热带系统在管道上安装图集号2.电伴热绝热工程的施工和验收要求与其他绝热工程剂同:图名11BS3示意图页374
电伴热线缠绕在管道上的螺距表(mm)Y国海管径管递散热量QB(W/m)与电伴热带发热量Q5(W/m)的比值DN (mm)1.11.21.31.41.51.61.71.81.925245170135115100908075703230021016514012511010090854034524019016014012511510595504252952352001751551401301206553537029525022019518016515080625430345290255230210190175100795550440370325290265245225150116580564554548043039035533020015151045835710620555505465430玻璃纤维带或铝筹胶带管道缠绕后用纤维线固定每段热线經绕于相反的万向电伴热带缠绕与安装缠绕前先用纤维线固定注:当Q5Lg,可将电伴热线缠绕在管道上。集号11BS3图名管道电伴热带缠绕安装表图页次375
关于本图集版权和实行专印、专售的声明
北京市城乡规划标准化办公室 北京工程建设标准化协会
GTCC-045-2018 铁道货车心盘磨耗盘-铁路专用产品质量监督抽查检验实施细则151122020815j:15112.20208fr:135.00