ASME+BPVC-IX-2017焊接和钎焊接工艺、焊工、钎焊工及焊接和钎接操作工评定标准.pdf

ASME+BPVC-IX-2017焊接和钎焊接工艺、焊工、钎焊工及焊接和钎接操作工评定标准.pdf
仅供个人学习
反馈
标准编号:
文件类型:.pdf
资源大小:11.4 M
标准类别:建筑工业标准
资源ID:311607
下载资源

标准规范下载简介

ASME+BPVC-IX-2017焊接和钎焊接工艺、焊工、钎焊工及焊接和钎接操作工评定标准.pdf

NONMANDATORYAPPENDIXD

MANDATORYAPPENDIXE

InefoiiowingAwsStandardveidingProcedure ArticleV

某街道排水及雨污水管道工程施工方案MANDATORYAPPENDIXF

NONMANDATORYAPPENDIXG

were included in the Sl equivalent if there was any ques tion. The values of allowable stress in Section Il, Part D generally include three significant figures. (e) Minimum thickness and radius values that are ex oressed in fractions of an inch were generally convertec according to thefollowing table:

(g) For nominal pipe sizes, the following relationshi were used:

(h)Areas in square inches (in.)were converted to square millimeters (mm°) and areas in square feet (ft*) were converted to squaremeters (m').See examples in the following table:

(h) Areasin square inches(in.)were converted square millimeters (mm°) and areas in square feet (f were converted to square meters (m").See examples chefollowingtable:

() Volumes in cubic inches (in.3) were converted to cubic millimeters (mm) and volumes in cubic feet (ft*) were converted to cubic meters (m'). See examples in the following table:

()Volumes in cubic inches (in.) were converted to cubic millimeters (mm) and volumes in cubic feet (ft) were converted to cubic meters (m'). See examples in the following table:

calculations,thereare cases where other units are used in che text.For example,kPa is used for small pressures. Also, rounding was to one significant figure (two at the most) in most cases. See examples in the following table. (Note that 14.7psi converts to 101kPa,while15psi converts to 1oo kPa. While this may seem at first glance to be an anomaly,it is consistent with the rounding philosophy.)

(k) Material properties that are expressed in psi or ks e.g., allowable stress, yield and tensile strength, elasti lodulus)were generally converted to MPa to three sig ificant figures. See example in the following table:

() Inmost cases, temperatures (e.g.,for PwHT) were rounded to the nearest 5°C.Depending on the implied precision of the temperature, some were rounded to the nearest 1°C or10°C or even 25°C.Temperatures colder than o°F (negative values) were generally rounded to

the nearest 1°C. The examples in the table below were created by rounding to the nearest 5°C, with one exception:

the nearest 1°C. The examples in the table below were created by rounding to the nearest 5°C,with one exception:

GB 51372-2019-T:小型水电站水能设计标准(无水印 带标签)MANDATORYAPPENDIXJ

NONMANDATORYAPPENDIXK

VELDERSANDWELDINGOPERATORSQUALIFIEDUNDER

The qualification record must record the essential vari ables for the welding process and list the ranges qualified. While the "actual values" recorded on the test record wil

TESTINGREQUIREMI

2 017 ASMEBoiler and pressure Vessel Co de ANINTERNATIONAL C 0 口E

3.实施性施工组织设计编制办法The AsME Boiler and Pressure Vessel Code (BPVC) is "An nternational Historic Mechanical Engineering Landmark," widely recognized as a model for codes and standards worldwide. Its development process remains open and ransparent throughout, yielding "living documents" that have mproved public safety and facilitated trade across global narkets and jurisdictions for a century. AsmE also provides BpvC users with integrated suites of related offerings

reterencedstandards related standards andguidelines conformity assessment programs training and development courses :ASMEPress books

©版权声明
相关文章