标准规范下载简介
甘12S2 给水工程veke电机必蕾核序流量扬程转速气件水泵外形及安装尺寸水泵型号功率重量隔报器余量或屑报垫底板厚度审(m/h)(m)(KW)(c/min)LL1B1B2cC1C2H1H2H3(kg)m1ISG20/1100.37/22.5150.3729602.34502903006016035010020050015333725JG21602ISG20/1601.1/22.5321.129602.34502903006016035010020050015337229JG21603ISG25/1100.55/24150.55对29602.34502803006016035010020050015338226JG1260校4ISG20/1150.55/23.6160.5529602.34502803006016035010020050015338227JG12605ISG25/1250.75/24200.7529602.34502803006016035050015338228JG22606ISG25/1501.1/23.7281.129602.34502803006016035050015338234JG21607ISG25/1601.5/24321.529602.34502803006016035010020050015339239JG21608ISG32/1100.55/24.5160.5529602.34502603006016035010020050015438528JG2260设9ISG32/1250.75/25200.7529602.34502603006016035010020050015438528JG226010ISG20/1100.12/41.253.750.1214802.54502903006016035010020050014031910JG226011ISG20/1600.18/41.2580.1214802.54502903006016035010020050014031913JG226012ISG25/1100.12/423.750.1214802.54502803006016035010020050014031912JG226013ISG25/1150.12/41.840.1214802.54502803006016035010020050014031913JG2260140.12/4250.1214802.54502803006016035010020050014031913JG226015ISG25/1500.18/41.86.40.1814802.54502803006016035010020050014031915JG226016ISG25/1600.25/4280.2514802.54502803006016035010020050014033717JG226017ISG32/1100.12/42.240.1214802.54502603006016035010020050014132214JG226018ISG32/1250.18/42.540.1814802.54502603006016035010020050014132214JG226019ISG40/900.37/25.6100.3729602.345034040026026040016026050018536040JG216020ISG40/1000.55/26.312.50.5529602.345034040026026040016026050018538042JG216021ISG40/1100.75/25.6160.7529602.345034040026026040016026050018539045JG216022ISG40/1251.1/26.3201.129602.345034040026026040016026050018539046JG2160图名ISG型立式单级单吸离心泵图集号甘12S2安装尺寸表(一)页次109
说明:1.TSWA型水象减振钢筋混减土基座模板及配筋图见本图册第84页 2.预埋件加工见本图册第84页P2
GTCC-048-2018 机车车辆总风软管连接器-铁路专用产品质量监督抽查检验实施细则ZTA型阻尼弹簧减振器性能参数及外形尺寸表
欢 1.外胶层2.内胶层3.骨果层4.钢丝图5.法兰 1.外 校 XGD1型橡胶挠性接头(单球体) XG XGD1型换胶热性差头规格
1.外胶层2.内胶层3.骨莱层4.钢丝图5.法当 XGD2型橡胶挠性接头(双球体) XGD2型捷胶挠性接头规格
核大一台水泵在气压维最高工作压力和最低工作压力维内的橡胶隔膜由组装厂自行选配,本图不做规定之和的一半时的流量。5.水泵外型尺寸以气压给水设备供货商所配产昂为准,5.确定气压罐的型号、规格、数量6.水泵应设同型号备用泵且水泵宜自灌式吸水,每台水泵的出水根据V.和P2确定罐的型号、规格、数量.从各气压罐技术参数表管应装设压力表、止回阀和阀门,自灌吸水的水泵吸水管上应装阀门。中查罐体总容积V。,选取特合要求的气压水罐,使V。>,,如一合罐不能7.水泵吸水一般情况需设断流水池其容积根据当地具体情况由设校满足要求时,可取多合罐组合,使其V。的和大于或等于V,,再根据P2选定计人确定。气压水罐的工作压力等级。五、设备安装6.选择电控柜1.气压给水设备宜装在泵房或设备间内,避免冰冻、日晒、风雨浸按运转要求、电源情况、电机容量等因素,选择电控柜,电控柜性蚀及人类活动的干扰,其环境温度以5~40"C为宜空气的相对湿度设能表见本图册164页。<85%(温度为20±5C时).设备与周围增壁的净距>700,与屋预净四、编制本图集的技术条件距>1000,维体上方宜设吊钩,以备安装和检修,设备的干管下方应设1.气压水罐的制造应符合压力容器的有关规定。维内介质为无蚀、管道支墩或管道支架具体作法由设计人定。无损害的气体和水罐内防属应采用造合生活饮用水的无毒型涂料,2.设备和管道安装完毕后应依照本图册总说明进行水冲洗和水压试2.水泵和气压罐可分别装在两个型钢底座上也可在滤要土基础上验,并经调试试运行正常后方可投入正式运行直接安装有隔振要求时,可采用橡胶隔报垫其选用方法及安装见本图册水象安装部分相关内容,3.同型号、同规格的唯体,因其工作压力等级不同其峰体的外形尺寸稍有差异,图中仅注其中一种尺寸。4.图中所采用的管材、管件、仪表等均选用标准产品或定型产品,图名图集号甘12S2气压给水设备设计施工说明(二页次162
立式隔膜式气压给水设备甲型组装尺寸表机组形式一罐一泵一罐二泵三泵二罐二泵二罐三泵三罐二泵三罐三泵核维体型号SQL400SQL600SQL800SQL1000SQL1200SQL1400SQL1600SQL1800SQL2000SQL1500SQL1600SQL1600SQL1800SQL2000水泵型号DP25DP25DP32DP50DP50DP50DP50DP50DP50DG65DG65DG80DG8ODG8040060080010001200140016001800200015001600160018002000H14201720216524502790294130393242347829903039303932423478710910111012101370153516851845200516151685168518452005F138153985628568457405A148148148178178400400400400650650680680680448448448478478700700700700950950980980980(510)(510)(510)(546)(546)546546546546750750780780780D410410410446446810810810135611751925124012402020(D )640640640810810135613561356190219252675202020202800710710710746746101010101010155613752125144014402220(E)94094094010101010155615561556210221252875222022203000L18692069234922692449275829333178335831283213329835433723L112901390157014251525164017401905200518451895196521302230L2520620720890990110512051370147011551205120513701470L3770770850535535535535535535690690760760760DN1808080100100100100125125100100100125125DN25050508080100100125125100100100125125DN32525325050505050506565808080DN42525325050505050506565808080说明:1.尺寸F及H按罐体工作压力1.6MPa而定,2.括号内数值为有备用泵时组装尺寸。图名立式隔膜式气压给水设备甲型图集号甘12S23.随设备的更新换代,安装尺寸如与实际有差异,应以实际尺寸为准组装尺寸表页次171
立式隔膜式气压给水设备乙型组装尺寸表
说明:1.尺寸A及H按罐体工作压加1.6MPα面定。 2.括号内数值为有备用泵时组装尺寸, 3.随设备的更新换代,安装尺寸如与实际有差异,应以实际尺寸为准,
卧式隔膜式气压给水设备甲型组装尺寸表卧式隔膜式气压给水设备乙型组装尺寸表机组一罐二泵三楼二罐三泵机组一罐二泵核形式形式审蝶体SQW1000SQW1200继体型号OSOW1400pQw1500sQW16000SQW1800SW2000/SQW2200QW2200SQW1800SQW2200QW2000型号SQW1000SQW12000sQW1400sosow1500sow1600OSow1800SQW2000SQW2200水泵DP40DP40DP50DP50DG65DG80DG80水泵型号DG80DG100DG80DG100DG100DP40DP40DP50型号DP50DG65DG80DG80DG8010001200140015001600180020002200220018002200200010001200140015001600180020002200H17621966216622742374257827782982298225782982277817621966216622742374257827782982校A40040040040065068068068073068073073022662570302031243224402449284928B700700700700950980980980103098010301030B400400400400650680680680c546546546546750780780780830780830830c700700700700950980980980D81081081081011751240124020201325202021552155940940960960960130013001300(D135613561356135619252020202028002155280029852985L116051755198020302185260030503052101010101010101013751440144022201525222023552355L2546546546546750780780780E155615561556155621252220222030002355300029852985L39101030115012101270143015701730226625663020312432244024492849284928402449284928L414201520172018001850227027702690L18608609609609601300130013002662221026622660L5320320320350350370370390L2940940535535690760760760840760840840LO35153815427043704856572066207402L391010301150121012701430157017301730143017301570( LO40604359481649165606650074008182L4142015201720180018502270277026902690227026902770DN1100100125125125150150150L5320320320350350370370390390370390370DN2100100125125125150150150LO260526652420245027603265333534155362459553625400DN34040505065808080L266027602555260529353460356035603933388039855175DN44040505065808080DN1100100125125125150150150200200200200说明:1.尺寸F及H按罐体工作压力1.6MPg面定,DN21001001251251251501501501251251251502.括号内数值为有备用泵时组装尺寸.DN34040505065808080100801001003.随设备的更新换代,安装尺寸如与实际有差异,应以实际尺寸为准DN4404050506580808010080100100图名卧式隔膜式气压给水设备图集号甘12S2组装尺寸表页次181
变频调速给水装置设计施工说明
变频调速供水设备(有稳压泵无气压罐)安装尺寸表
GTCC-087-2018 电气化铁路用70mm2~150mm2铜合金绞线-铁路专用产品质量监督抽查检验实施细则质量表D质量核DNDt1H1H2H3RrLH(kg)50893.5360655167.0104.9241.11300.62 801334390646273.7181.2368.61601.2410015943110646345.4232.5450.01801.751252094M130746367.1231.7566.52102.63hN对1502454.53160946466.2300.5678.52604.05校20032565210928619.8402.5920.231010.18250401852708010856.3578.8139.236015.03CH3004808628012010895.5605.21319.341024,4835055496380119111208.0817.8580.151036.28本40063096430119111351.8909.91793.056045.13设[tIti501333.5360655121.050.0242.01300.78DN802194390646184.573.4369.01601.78L1002734110646221.682.9443.21802.5612532543130746215.086.8430.02103.081504014.53160946329.9129.3659.82605.7270*20053065210928422.0172.0844.03109.73250635852708010565.7240.61131.436014.463007708628012010614.0256.01228.041036.183508209638011911808.2386.41616.451047.214009209643011911917.5421.41833.256059.94说明:1.刺以口用A3钢板制造用E43焊条焊接2.喇以口表面刷底漆一遍(丹或冷子油)面漆颜色及微法由设计人定喇叭口下料展开图图名吸水喇叭口大样图图集号甘12S2(DN50~DN400)页次197
核审强3~52~3PL:校1.石棉水泥或自应力水泥填料:2.油麻或胶圈嵌缝承插式铸铁管刚性接口承插式铸铁管柔性接口计铸铁管接口尺寸表铸铁管接口尺寸表设公称承口管壁承口填料嵌缝直管胶围胶围压缩公称直径承口深度管壁厚度内径外径承口外径直管长度胶直径深度厚度外径内径外径深度深度长度直径中心比DNPtD1D2D3LDo重量DNPtD1D2D3L1L2Ld长度P1(mm)(mm)(mm)(mm)(mm)(mm)(mm)(mm)(kg)759010739316956111824544.475909.07593.01691150.2310095109811819459141831444.4100959.0100118.01941400.28(125)9510.5122143219591430001838244.41501009.2150169.024530001910.40 15010011.1471692455916(4000,1845144.420010010.1200220.0300(4000,2420.552001001219622030059165000,1858844.425010511250271.6357.65000,2940.6325010513245.6271.6357.659166000)1972542.130010511.9300322.8410.86000)3450.8030010514294.8322.8410.859161986242.1(350)11012.8350374.04643970.92(350)110153443744646318.519105842.140011013.8400425.6519.64481.2040011016393.6425.6519.66318.519120342.1图名承插式铸铁管接口图图集号甘12S2(DN75~DN400)页次204
HH核审承插浙缩管插承渐缩管对校渐缩管规格、重量表公称直径各部尺寸重量 (kg/个)公称直径各部尺寸重量 (kg/个)DNDN1AcEW承插插承DNDN1ABcE承插插承四承十字管计设10075502002005030020.5719.95(125)5066.2156.64(125)755022.8721.83300150802002005540069.6260.885020020030010024.8925.082006076.9570.1110028.4427.802507085.26555030082.27150200200(125)31.0130.171505582.9670.07公称直径各部尺寸(mm)重量DN10036.2933.732006090.4479.45(mm)LH(kg/ 个)50(350)80200200400200(125)6020020030038.8936.152507098.9191.7720038019091.681505541.7339.8330080107.93103.80250450225131.5410051.7945.401505506.6792.44300520260171.3550(125)54.8648.2920060115.32102.99(350)590295224.83250702002004001505558.1952.484002509020020070500125.06116.58400660330281.732006062.4258.58300135.42129.9580300100802005063.0753.67(350)146.63145.29图名铸铁浙缩管、四承十字管图图集号甘12S2(DN100~DN400)页次206
核电校承盘短管插盘短管套管乙字管短管规格、重量套管规格、重量乙字管规格、重量计公称承插短管插盘短管插盘短管(加长型)公称套管各部尺寸公称设各部尺寸直径质量直径直径壁摩重量直径重量LL质量L重量DN(mm)(kg/个)(mm)(kg/个)(mm)(kg/个)DND8R(kg/个DNH(kg/)7512012.7840012.2670017.9075113143628149030015.8475200150200200346.418.4610012016.0140015.3070022.62100138143628149530018.97100200150200200346.424.06(125)12018.6740019.4070028.84(125)163143628149530022.80125)225150225225389.430.9715012023.0040024.5670036.341501891436281410030025.3815025020025025043342.0520012031.5350040.3070051.592002401538301510030034.19200300250300300519.668.2925017046.2150053.8570068.0525029416.5383216.510530045.27250300250300300519.693.0130017057.1850068.8670088.4130034517.5383317.510535062.43300300250300300519.6118.38(350)17072.3650086.51700110.86(350)3961940341911035076.89(350)350250350350606.2160.9840017087.62500106.19750143.234004482040362011035091.26400400250400400692.8211.33图名铸铁短管、套管、乙字管图图集号甘12S2(DN75~DN400)页次207
90°弯管规格、重量
45°弯管规格、重量
GB/T 42069-2022 瘦肉型猪肉质量分级校22号°弯管图11°弯管图224°弯管规格.重量11°弯管规格.重量本公称内径壁厚双承奇管承插弯管公称内径壁厚双承弯管承插弯管设直径D1tRU质量Rs重量直径D1RU质量RU重量DN(mm)(mm)(mm)(mm)(kg/ 个)(mm)(mm)(mm)(kg/个)DN(mm)(mm)(mm)(mm)(kg/ 个(mm)(mm)(kg/个)7573.010280109.217.28800150312.116.507573.01028054.916.253000588.119.3810098.01030011721.90800150312.121.0510098.01030058.820.463000588.124.11(125)122.010.5325126.826.341000150390.128.50(125)122.010.532563.724.333000588.129.95150147.011350136.632.061000150390.134.95150147.01135068.629.363000588.136.79200196.012400156.145.551200150468.253.79200196.01240078.441.114000784.163.06250245.613450175.664.641200150468.273.46250245.61345088.257.924000784.185.95300294.814500195.182.741400150546.3100.93300294.8145009873.144000784.1109.31(350)344.015550214.6107.111600624.3117.79(350)344.015550107.893.955000980.2160.84400393.616600234.1132.191800702.3154.87400393.616600117.6112.025000980.2195.62图名1*图集号甘12S2((DN75DN400)页次210