施工组织设计下载简介
内容预览随机截取了部分,仅供参考,下载文档齐全完整
车库工程模板施工方案(56P).doc按悬臂梁,R1=Rmaxl=1.47×0.15=0.22kN
R=max[Rmax,R1]=1.47kN;
同理JCT903-2012 吸声板用粒状棉,R'=1.1kN,R''=1.1kN
计算简图如下:
主梁弯矩图(kN·m)
Mmax=0.68kN·m
σ=Mmax/W=0.68×106/5080=134.16N/mm2≤[f]=205N/mm2
主梁剪力图(kN)
Vmax=4.08kN
τmax=2Vmax/A=2×4.08×1000/489=16.67N/mm2≤[τ]=125N/mm2
主梁变形图(mm)
νmax=0.75mm
νmax=0.75mm≤[ν]=2mm
λ=h/i=1800/15.9=113.21≤[λ]=150
查表得,φ=0.54
Mw=0.92×1.4×0.29×0.8×1.82/10=0.08kN·m
Nw=0.9×[1.2×(0.75+(24+1.1)×0.3)+0.9×1.4×1]×0.8×0.8+0.92×1.4×0.08/0.8=6.57kN
f= Nw/(φA)+ Mw/W=6568.89/(0.54×424)+0.08×106/4490=47.33N/mm2≤[f]=205N/mm2
按上节计算可知,可调托座受力N=6.57kN≤[N]=30kN
梁模板(扣件式)计算书
设计简图如下:
取单位宽度1000mm,按三等跨连续梁计算,计算简图如下:
W=bh2/6=1000×15×15/6=37500mm3,I=bh3/12=1000×15×15×15/12=281250mm4
q1=0.9max[1.2(G1k+ (G2k+G3k)×h)+1.4Q1k,1.35(G1k+ (G2k+G3k)×h)+1.4×0.7Q1k]×b=0.9max[1.2×(0.1+(24+1.5)×0.9)+1.4×2,1.35×(0.1+(24+1.5)×0.9)+1.4×0.7×2]×1=29.77kN/m
q1静=0.9×1.35×[G1k+(G2k+G3k)×h]×b=0.9×1.35×[0.1+(24+1.5)×0.9]×1=28.01kN/m
q1活=0.9×1.4×0.7×Q2k×b=0.9×1.4×0.7×2×1=1.76kN/m
q2=(G1k+ (G2k+G3k)×h)×b=[0.1+(24+1.5)×0.9]×1=23.05kN/m
σ=Mmax/W=0.05×106/37500=1.23N/mm2≤[f]=15N/mm2
νmax=0.677qL4/(100EI)=0.677×23.05×133.334/(100×10000×281250)=0.018mm≤[ν]=l/400=133.33/400=0.33mm
3、支座反力计算
设计值(承载能力极限状态)
R1=R4=0.4 q1静l +0.45 q1活l=0.4×28.01×0.13+0.45×1.76×0.13=1.6kN
R2=R3=1.1 q1静l +1.2 q1活l=1.1×28.01×0.13+1.2×1.76×0.13=4.39kN
标准值(正常使用极限状态)
R1'=R4'=0.4 q2l=0.4×23.05×0.13=1.23kN
R2'=R3'=1.1 q2l=1.1×23.05×0.13=3.38kN
为简化计算,按四等跨连续梁和悬臂梁分别计算,如下图:
Mmax=max[0.107q1l12,0.5q1l22]=max[0.107×4.42×0.82,0.5×4.42×0.32]=0.3kN·m
σ=Mmax/W=0.3×106/36750=8.24N/mm2≤[f]=15.44N/mm2
Vmax=max[0.607q1l1,q1l2]=max[0.607×4.42×0.8,4.42×0.3]=2.147kN
τmax=3Vmax/(2bh0)=3×2.147×1000/(2×45×70)=1.02N/mm2≤[τ]=1.78N/mm2
ν1=0.632q2l14/(100EI)=0.632×3.41×8004/(100×9350×1286200)=0.73mm≤[ν]=l/400=800/400=2mm
ν2=q2l24/(8EI)=3.41×3004/(8×9350×1286200)=0.29mm≤[ν]=l/400=300/400=0.75mm
4、支座反力计算
梁头处(即梁底支撑小梁悬挑段根部)
承载能力极限状态
Rmax=max[1.143q1l1,0.393q1l1+q1l2]=max[1.143×4.42×0.8,0.393×4.42×0.8+4.42×0.3]=4.04kN
同理可得,梁底支撑小梁所受最大支座反力依次为R1=R4=2.47kN,R2=R3=4.04kN
正常使用极限状态
R'max=max[1.143q2l1,0.393q2l1+q2l2]=max[1.143×3.41×0.8,0.393×3.41×0.8+3.41×0.3]=3.12kN
同理可得,梁底支撑小梁所受最大支座反力依次为R'1=R'4=2.14kN,R'2=R'3=3.12kN
主梁自重忽略不计,计算简图如下:
主梁弯矩图(kN·m)
σ=Mmax/W=0.384×106/5080=75.5N/mm2≤[f]=205N/mm2
主梁剪力图(kN)
Vmax=6.342kN
τmax=2Vmax/A=2×6.342×1000/489=25.94N/mm2≤[τ]=125N/mm2
主梁变形图(mm)
νmax=0.17mm≤[ν]=l/400=450/400=1.12mm
4、扣件抗滑计算
R=max[R1,R3]=1.58kN≤8kN
单扣件在扭矩达到40~65N·m且无质量缺陷的情况下,单扣件能满足要求!
同理可知,右侧立柱扣件受力R=0.17kN≤8kN
单扣件在扭矩达到40~65N·m且无质量缺陷的情况下,单扣件能满足要求!
λ=h/i=1800/15.9=113.21≤[λ]=150
长细比满足要求!
查表得,φ=0.54
Mw=0.92×1.4×ωk×la×h2/10=0.92×1.4×0.29×0.8×1.82/10=0.09kN·m
q1=0.9×[1.2×(0.1+(24+1.5)×0.9)+0.9×1.4×2]×1=27.16kN/m
同上四~六计算过程,可得:
R1=1.48kN,R2=10.42kN,R3=0.17kN
f=N/(φA)+Mw/W=10530.9/(0.54×424)+0.09×106/4490=64.64N/mm2≤[f]=205N/mm2
由"主梁验算"一节计算可知可调托座最大受力N=max[R2]=11.27kN≤[N]=30kN
柱模板(设置对拉螺栓)计算书
新浇混凝土对模板的侧压力标准值G4k=min[0.22γct0β1β2v1/2,γcH]=min[0.22×24×4×1×1.15×2.51/2,24×2]=min[38.4,48]=38.4kN/m2
承载能力极限状态设计值S承=0.9max[1.2G4k+1.4Q3k,1.35G4k+1.4×0.7Q3k]=0.9max[1.2×38.4+1.4×2,1.35×38.4+1.4×0.7×2]=0.9max[48.88,53.8]=0.9×53.8=48.42kN/m2
正常使用极限状态设计值S正=G4k=38.4 kN/m2
最不利受力状态如下图,按三等跨连续梁验算
静载线荷载q1=0.9×1.35bG4k=0.9×1.35×0.5×38.4=23.33kN/m
活载线荷载q2=0.9×1.4×0.7bQ3k=0.9×1.4×0.7×0.5×2=0.88kN/m
σ=Mmax/W=0.1×106/(1/6×500×152)=5.2N/mm2≤[f]=15N/mm2
作用线荷载q=bS正=0.5×38.4=19.2kN/m
ν=0.677ql4/(100EI)=0.68×19.2×2004/(100×10000×(1/12×500×153))=0.15mm≤[ν]=l/400=200/400=0.5mm
小梁上作用线荷载q=bS承=0.2×48.42=9.68 kN/m
小梁弯矩图(kN·m)
Mmax=0.25kN·m
σ=Mmax/W=0.25×106/36.75×103=6.87N/mm2≤[f]=15.44N/mm2
小梁上作用线荷载q=bS正=0.2×38.4=7.68 kN/m
面板变形图(mm)
ν=0.25mm≤[ν]=1.5mm
1、柱箍强度验算
长边柱箍计算简图
长边柱箍弯矩图(kN·m)
长边柱箍剪力图(kN)
M1=0.54kN·m,N1=4.08kN
短边柱箍计算简图
短边柱箍弯矩图(kN·m)
短边柱箍剪力图(kN)
M2=0.54kN·m,N2=4.08kN
M/Wn=0.54×106/(5.08×103)=106.02N/mm2≤[f]=205N/mm2
2、柱箍挠度验算
长边柱箍计算简图
长边柱箍变形图(mm)
短边柱箍计算简图
短边柱箍变形图(mm)
ν1=0.66mm≤[ν]=l/400=1.5mm
ν2=0.66mm≤[ν]=l/400=1.5mm
N=4.08×2=8.16kN≤Ntb=17.8kN
N=4.08×2=8.16kN≤26kN
墙模板(非组合式钢模板)计算书
新浇混凝土对模板的侧压力标准值G4k=min[0.22γct0β1β2v1/2,γcH]=min[0.22×24×4×1×1.15×2.51/2,24×3]=min[38.4,72]=38.4kN/m2
承载能力极限状态设计值S承=0.9max[1.2G4k+1.4Q3k,1.35G4k+1.4×0.7Q3k]=0.9max[1.2×38.4+1.4×2,1.35×38.4+1.4×0.7×2]=0.9max[48.88,53.8]=0.9×53.8=48.42kN/m2
正常使用极限状态设计值S正=G4k=38.4 kN/m2
墙截面宽度可取任意宽度,为便于验算主梁,取b=0.53m,W=bh2/6=525×152/6=19687.5mm3,I=bh3/12=525×153/12=147656.25mm4
q=bS承=0.53×48.42=25.42kN/m
面板弯矩图(kN·m)
Mmax=0.03kN·m
σ=Mmax/W=0.03×106/19687.5=1.61N/mm2≤[f]=15N/mm2
q=bS正=0.53×38.4=20.16kN/m
面板变形图(mm)
ν=0.02mm≤[ν]=l/400=100/400=0.25mm
q=bS承=0.12×48.42=6.05kN/m
小梁弯矩图(kN·m)
小梁剪力图(kN)
Mmax=0.11kN·m
σ=Mmax/W=0.11×106/36750=2.87N/mm2≤[f]=15.44N/mm2
q=bS正=0.12×38.4=4.8kN/m
小梁变形图(mm)
ν=0.07mm≤[ν]=l/400=100/400=0.25mm
3、支座反力计算
R1=2.78kN,R2=...R59=2.22kN,R60=1.67kN
主梁弯矩图(kN·m)
DL/T 943-2015标准下载 Mmax=1.19kN·m
σ=Mmax/W=1.19×106/10160=116.96N/mm2≤[f]=205N/mm2
主梁变形图(mm)
ν=1.07mm>[ν]=l/400=400/400=1mm
对拉螺栓横向验算间距m=max[400,400/2+325]=525mm
对拉螺栓竖向验算间距n=max[400DB45/T 2048-2019 微型消防站建设管理规范,400/2+75]=400mm
N=0.95mnS承=0.95×0.53×0.4×48.42=9.66kN≤Ntb=17.8kN