大道西段快速路工程深基坑专项施工方案温州市瓯海大道西段快速路工程Ⅲ标
浙江奔腾建设工程有限公司
温州市瓯海大道西段快速路工程Ⅲ标项目部
一、工程概况··········································3
建标 195-2018 工程项目建设标准1、深基坑概况·············································3
2、地质情况···············································4
3、平面位置···············································4
二、编制依据··········································4
三、施工计划··········································5
1、施工时间安排···········································5
2、资源投入情况···········································5
四、工艺方法··········································5
1、总体设想···············································5
2、施工流程···············································6
3、围堰施工···············································6
4、河边桥台开挖支护方法···································6
5、陆地基坑开挖支护方法···································7
6、钢板桩施工·············································7
7、土方开挖···············································8
8、基坑排水···············································9
9、砼结构物施工···········································9
10、钢板桩拔除············································9
五、设计计算··········································9
1、陆地基坑围护计算·······································15
2、河边基坑围护计算······································18
六、安保措施··········································9
1、组织体系建设···········································9
2、沉降监测控制··········································10
无棣县振华机电设备安装有限公司蒸汽锅炉安装工程施工组织设计3、安全文明措施··········································10
七、其它事项·········································11
1、其它辅助方法··········································11
2、沉木河桥0#台第四幅基坑································11
3、加强与水务部门、地方政府的联系沟通····················12
瓯海大道西段快速路工程Ш标段全长1061m(k4+124~k5+185),主要为高架桥梁、地面桥和地面道路等,涉及深基坑的承台和桥台位于半塘河、沉木河、中横河等三座桥梁处。
具体位置和开挖深度如下:
5.8×25(7.35)
交通标志标线工程施工组织设计5.8×25(7.35)