标准规范下载简介
ASME HST-6-2020 气动钢索式提升机的性能标准.pdfRefer to the following publications, copies of which may be obtained from the publisher as indicated. The bearing the latest date of issue shall be used unless otherwise noted
Air Wire Rope Hoist Chara
Paints and coatings shall be lead and chromate free
Paints and coatings shall be lead and chror
ECHANICAL REOUIREMEN
pressures between 80 psi and 100 psi (0.55 MPa and 0.69 MPa).The air motor shall have adequate power and star
PICAL HOIST INOUIRY D
水库大坝安全管理应急预案编制导则SL/ Z 720-2015.pdfNONMANDATORYAPPENDIXB
of which may be obtained from the publisher as indicated. The bearing the latest date of issue shall be used unless otherwise noted.
lechanical and Pneumatic Hoistand TrolleyBrake
ASME Services
technical inquiries ed tothis code or standard is sho right page. All technical inquiries must be submitted in writing to the