GB 50062-2008-T 电力装置的继电保护和自动装置设计规范(英文版)

GB 50062-2008-T 电力装置的继电保护和自动装置设计规范(英文版)
仅供个人学习
反馈
标准编号:JGJ T 466-2019
文件类型:.pdf
资源大小:570.83 kb
标准类别:建筑工业标准
资源ID:200224
下载资源

JGJ T 466-2019标准规范下载简介

GB 50062-2008-T 电力装置的继电保护和自动装置设计规范(英文版)

GB /T 50062 2008

GB / T 50062 2008

JC/T 2464-2018 水泥窑用干法耐火喷射料GB /T 50062 2008

GB/T500622008

Busbar Protection

GB /T 50062 2008

GB/T 50062 2008

8.1PowerCapacitorProtectic

GB /T 50062 2008

GB/T500622008

GB /T 50062 2008

GB/T 50062 2008

GB /T 50062 2008

GB / T 50062 2008

T0 Automatic Reclosing

GB /T 50062 2008

GB/T500622008

In any cases,the number of operations of automatic reclosing devices shall be as that specified in advance. 4Reclosing devices shall be blocked when circuit breakers are in abnormal conditions that do not permit automatic reclosing.

GB /T 50062 2008

GB /T 50062 2008

GB / T 50062 2008

13Synchronization Closing

GB /T 50062 2008

14 Automatic Excitation Regulation and

14.1 Automatic Excitation Regulation

GB/T500622008

GB /T 50062 2008

GB/T 50062 2008

i5.1 Secondary Circuits

GB /T 50062 2008

15.2.1 Current transformers shall Comply with the followin

GB/T 50062 2008

GB/T500622008

secondary circuit of potential transformers,except for residual voltage windings or unless otherwise stated. Equipment potentially to be disconnected shall not be disposed on ground wires. Wherephase B grounding is used, the fuses or automatic switches shall be installed between winding terminals and earthing points. Test leads for residual voltage windings of potential transformers shall be provided with fuses or automatic switches.

15.3DC Power Supply

GB/T 50062 2008

switches can sharethe samegroupof fuses or automatic switches 5 Both fuses and automatic switches of power supply circuits shall be monitored. 15.3.3Protection equipment shall be configured for signal circuits of relaying protection and automatic devices in accordance with the following requirements: 1 Signal circuits for both relaying protection and automatic devices shall all be provided with fuses or automatic switches. 2Common signal circuits shall beprovided with separate fuses orautomaticswitches. 3Both fuses and automatic switches of signal circuits shall be monitored

GB/T 50062 2008

GB /T 50062 2008

DB/T 56-2013 地震科技文献分类标引规则Appendix A Permissible Impulse Current Factors of

GB/T500622008

Table A.0.1 (continued)

GB/T500622008

Table B.0.1 (continued)

GB / T 50062 2008

码头评估规范Explanation of Wording in This Code

©版权声明
相关文章