标准规范下载简介
2017年中国沿海台风统计-香港天文台资料圖3.7.7 Figure 3.7.7
圖 3.7.7 深水埗有镀锌鐵片障下,毁兩部私家单。(圖片噶谢:谭曉) Figure 3.7.7 Fallen galvanized iron sheets damaged two private cars in Sham Shui Po (Photocourtesyof TamHiuFai)
.7.7 深水埗有镀锌鐵片障下,毁兩部私家单。(圖片噶谢:谭曉) re3.7.7 Fallengalvanized iron sheetsdamagedtwoprivate cars in Sham Shui Po (PhotocourtesyofTamHiuFai)
CECS 394:2015 七氟丙烷泡沫灭火系统技术规程ROPICAL CYCLONE STATISTICS AND TA
TABLE 4.2 gives the number of tropical cyclone warnings for shipping issued by the Hong Kong Observatory in 2017, the durations of these warnings and the times of issue of the first and last warnings for all tropical cyclones in Hong Kong's area of responsibility (i.e. the area bounded by 10°N. 30°N,105°Eand 125°E). Times are given in hours and minutes in UTc
TABLE 4.3 presents a summary of the occasions/durations of the issuing of tropical cyclone warning signals in 2017.The sequence of the signals displayed and the number of tropical cyclone warning oulletins issued for each tropical cyclone are also given.Times are given in hours and minutes in Hong Kong Time.
TABLE 4.5 gives the annual number of tropical cyclones in Hong Kong's area of responsibility 1956and 2017 and also the annual number of tropical cyclones necessitated the issuingo cyclone warning signals in Hong Kong.
表4.2 TABLE4.2 TROPICAL CYCLONE WARNINGS EORSHIPPINGSSI JEDIN2017
追些熟带氣旋引致天文台需要出熟带氣旋警告信號。 时周為協調世界时。 * Tropical cyclones for which tropical cyclone warning signals were issued in Hong Kong +Times are given in UTC.
*这些熟带氣旋引致天文台需要發出熟氣旋警告信
表4.3 二零一七年天文台所發出的熟带氣旋警告信號及警報發出的次数 TABLE4.3 TROPICALCYCLONEWARNINGSIGNALS ISSUEDINHONGKONGAND NUMBEROFWARNING BULLETINSISSUEDIN2017
Hong Kong Time (UTC + 8 hours)
二零一七年間天文台發出熟带氣旋警告信號的时段 TROPICALCYCLONEWARNINGSIGNALSISSUEDINH
驻:(内為創造该記的熟带氣旋名及年份。
the years and the names of the tropical cyclones whi
表4.7 (绩) TABLE 4.7(cont'd)
表4.11 (绩) TABLE 4.11 (cont'd)
建筑电气工程设计常用图形和文字符号表4.12 二零一七年大文台段出的熟带氣旋路控预测龄证(缺差单位高公里) TABLE 4.12Verification of the tropical cyclone track forecasts issued by the Hong Kong Observatory in 2017 (Error in the unit of km)
以下是二零一七年位於北太平洋西部及南海區域(即由赤道至北緯45度丶東經1 至180度所包括的圜)的熟带氣旋。其每六小时之位置及强度刊於本節。
TROPICALCYCLONEPOSITIONANDINTENSITYDATA,2017
(a) T.D. : tropical depression (b) T.S. : tropical storm (c) S.T.S. : severetropicalstorm (d) T. : typhoon (e) S.T. : severe typhoon (f)Super T. : supertyphoon
風纳沙(1709)的每六小时位置及强度
GB/T 38112-2019 管廊工程用预制混凝土制品试验方法Became Extratropical