(ABB技术应用白皮书5)Circuit-breakers-for-direct-current-applications 2011【经典】.pdf

(ABB技术应用白皮书5)Circuit-breakers-for-direct-current-applications 2011【经典】.pdf
仅供个人学习
反馈
标准编号:
文件类型:.pdf
资源大小:1.1 M
标准类别:建筑工业标准
资源ID:313799
下载资源

标准规范下载简介

(ABB技术应用白皮书5)Circuit-breakers-for-direct-current-applications 2011【经典】.pdf

8 Use of alternating current equipment in

ipmentindirectcurren

GBT 6892-2015标准下载Technical Application Papers

Table 19 Coefficient km accordling to the connection modality of the CB poles

I3= 10 xIln x km = 10 x 160 x 1.3= 2080 A (±20% tolerance)

8.2ConnectionoftheCBpoles inparallel

ent in direct curreni

Technical Application Papers

9 ABB offerl

9 ABB offer

Miniature circuitabreakers

The following table shows the electrica/characteristics ofthe MCBs type S280 UC

Forthepoleconnectionspleaserefertothefollowi electricalscheme:

Technical Application Papers

to be used in d.c. circuits with high voltages, typical of photovoltaic plants (in the connection section between panels and inverter)

9 ABB offer

Power distribution

Technical Application Papers

Motorprotection

Technical Application Papers

Characierstcs

AvailablesizeandmaincharacteristicsTmaxPy

9 ABB offer

Technical Application Papers

9 ABB offer

XSMSEMNEMSENESENEMSVEMSEMSEMSEMEMS

Direct current distribution systems

Technical Application Papers

earthing point Figure 27 IT d.c. distribution system with the middle point of the supply distribution systen isolatedformearth

Protectionagainstindirectcontact

The calculations on the following pages refer to this schema: Figure 29 Schema referred to the d.c. circuit

Figure 29 Schema referred to the d.c. circuit

0.95 Eb Ikb= R + 0.1 Rb

Timetopeakt.andrisetimeconstantT To determine these parameters it is necessary to calculate the relationshipi

0 R 1 L T.

with the time constant T, = 30ms

112577_网架钢结构施工组织设计ABBSAcEofferforuseupto1000Vd.c

Technical Application Papers

reakersforuseupto10

DB43/ 1665-2019 农村生活污水处理设施水污染物排放标准Technical Application Papers

Contact us

We reserve the right to make changes in the course of technical development of the product Copyright 2011 ABB. All rights reserved.

©版权声明
相关文章