云南2020定额-建筑工程计价标准-安装部分-13工业炉窑砌筑工程.pdf计量单位:m定额编号2131412~13142213143213144耐火浇注料项目名称隔热耐火浇注料耐火可塑料炉体步进梁基价(元)2775.753445.522112.214181.86人工费(元)2061.922920.111584.733351.73其定额人工费(元)1718.272433.421320.612793.11其中规费(元)343.65486.69264.12558.62中材料费(元)390.881.31323.22310.45机械费(元)322.95524.10204.26519.68名称单位单价(元)数量T综合工日07工日140.6414.66120.76311.26823.832耐火浇汁料m(1060)1060)隔热耐火浇注料n(1.060)耐火可塑料m1200木板m2188.800.1750.1440.105材料浪板PVC料m35.000.810塑料平板PVCm25.000.730铁钉L70kg4.911.3301.1500.800水m5.940.2200.2200.400高压风管013m5.006.020木工圆锯机直径:500mm台班14.510.2800.2400.200皮带运输机带长×带克:10×0.5m台班342.040.1400.1400.0700.140叉式起重机提升质量:31台班511.900.3200.3200.1600.320机械手持式内然背岩机请空深度6mm台班105.460.820电动空气压缩机排气量:10m/min台班266.580.820涡米式混凝土揽机出料容量:350L台班306.270.35010200.310•43·
计量单位:1定额编号213173213174213175213176项目名称擦打底棚缝垫阴极方钢加工安装阴极炭块组砌侧部炭块基价(元)1775.991240.02597.571367.24人工费(元)1375.88632.88359.481126.39其定额人工费(元)1146.57527.40299.56938.65其中规费(元)229.31105.4859.92187.74中材料费(元)70.2066.0524.8135.33机械费(元)329.91541.09213.28205.52名称单位单价(元)数量综合工日07T工日[40.649.7834.5002.5568.009SHY1085)热方钢(综合)(1.025 )105001030焦炭1.1760.0004283500氧气8.583.000材料快15.831.600石棉粉kg3.132.500石绒水玻璃kg1.205.00006058.000水5.940.090原式统床台宽×台长:400×1600m台班296.220430单速电动芦提升质量:2t台班26.110.330轴流通风机功率:75kW30.750.430箱式加热护功率:45kW台班85.130.330266.580.2600.020载重汽车装载质量:41械台班454.710.150式起重机提用质量351190201300110010汽车式起重机提升质量:8t台班834.260.1000.6000.100校直机19.540.500频式破碎机进口料:250×400mm台班330.130.250半直动切剂机厚度:100mm台班61.520.500·52·
五、其他炉窑 1.连续式直立炉
一、本章定额适用于第一章“专业炉窑”中未列的一般工业炉窑砌筑工程。 二、本章定额工作内容包括砌筑的主要工作内容(准备、立线杆、放线、材料运输、泥浆搅拌、砌 筑、吊装、临时砖加工、勾缝、质量自检等全部工序);不包括选砖、预砌筑、集中砖加工等次要工序的 工作内容,发生时可执行本册第四章相应项目。 三、平面砌体、弧面砌体内的孤形,圆形拱砌体,执行烧嘴项目。 四、15m3以下炉窑是按砖种,不分部位及砌体类别综合编制的,适用于工程量15m以下的炉窑;但 炉外烟道(内外烟道以沉降缝为界),应执行《云南省建筑工程计价标准》。 五、定额内隔热砖按现行施工规范要求,隔热砖(含高铝质、黏土质)原则上不需要进行加工,故 本定额未列隔热砖加工机械台班,但如果需要加工时,可执行本册机械砖加工定额相应项目(指黏土质 耐火砖),乘以系数0.25。 六、定额中干法砌体(如干砌体镁砖、铬镁砖)项目未考虑衬垫材料,如设计需要,每立方米砌体 可增加厚度为0.8~1.5mm,热轧薄钢板1.27kg。
一、一般工业炉窑工程量应按砖种、部位、造型、砖型,按主要工序和次要工序分别计算,如需改 型加工,其加工损失量按定额有关规定执行。 二、工程量的计算单位按定额规定可采用“m、m、t、m”等,一般保留两位小数,高级耐火材料 保留三位小数,如刚玉砖。 三、计算工程量应以施工图所标尺寸为依据,可不扣除砖缝、小于25mm的膨胀缝、断面积小于 0.02m²孔洞,或断面积小于0.06m²、长度(或深度)不超过1m的孔洞,炉门喇叭口和墙根交叉处的小 斜坡。 四、炉体烟道弧形1~7形岔口工程可按本册定额第一章说明第一条所规定的不同直径增加工程量, 如红砖结构的岔口增加的工程量为表列相应项目的1.2倍,管道岔口增加的工程量为表列相应项目的 2倍。 五、如遇数量不大(小于15m以下)造型特别复杂,而体积计算过于繁琐的砖型或部位,可按设计 图纸标明的单重折算成体积。根据耐火制品的净用量所占体积,换算成砌体工程量公式如下: V=WXS/RP 式中:V一工程量(m"); W一耐火砖单重; S一一复杂部位设计需用耐火砖块数; P一一每m砌体净用量中耐火砖所占体积; R一定额取定容重。 六、管道衬砖工程量按砖种、砖型、内衬直径大小(划分为Φ1m以上、Φ1m以下两个级别)分别计 算,如采用隔热耐火砖作内衬时,不必按工作层与非工作层分别划项计算。 七、管道衬砖(包括烟道)遇有岔口时,其砌体工程量除按图形计算外,还可根据岔口造型苏J02-2003 地下工程防水做法,按下 表增加工程量。
W一耐火砖单重; S一一复杂部位设计需用耐火砖块数; P一每m砌体净用量中耐火砖所占体积; R一定额取定容重。 六、管道衬砖工程量按砖种、砖型、内衬直径大小(划分为Φ1m以上、Φ1m以下两个级 算,如采用隔热耐火砖作内衬时,不必按工作层与非工作层分别划项计算。 七、管道衬砖(包括烟道)遇有岔口时,其砌体工程量除按图形计算外,还可根据岔口 表增加工程量,
每一个管道岔口增加工程最表
注:1.如烟道岔口增加工程量为管道相应项目的1/2:
2.异径管道可按大直径计算
、本草定额适用于工业炉窑中各种耐火(隔热)浇注料、耐火捣打料、耐灭可塑料和耐灭喷涂料 工程,不适用于工厂预制或永久性生产车间生产的耐火(隔热)浇注料预制块。 二、本章定额的工作内容包括:施工部位的清扫与准备,施工测量放线;现场200m以内水平运输、 不定形耐火材料的搅拌与输送,模板制作、安装、拆除,浇注料的浇注与振动、可塑料和捣打料的捣固、 喷涂料的喷涂;自然干燥与养护;工作地点的清扫与清废。 三、耐火(隔热)浇注料、耐火可塑料和耐火捣打料工程,施工所耗用的模板已按接触面积综合计 算在定额含量内。 四、耐火可塑料基价的材料消耗量中未考虑,因设计压缩比要求而增加的材料消耗量,发生时可按 实调整。 五、本章定额未考虑炉壳除锈,不定形耐火材料中埋设钢筋,锚固件和铺设铁丝网及可塑料维护修 整的工料消耗,发生时执行辅助工程中的相应项目。 六、定额内不包括用蒸汽、煤气、红外线等烘烤养护要求,发生时可按实调整。 七、执行本章定额中密闭式工业炉耐火或隔热浇注料定额项目,必须具备三个基本条件,缺一不可: 1.必须是不准许开割进料孔的炉壳。 2.炉壳的内径小于2500mm。 3.全炉耐火(隔热)浇注料工程量小于30m。 八、喷涂定额适用于各种工业炉窑,金属烟肉的耐火、隔热、耐磨衬里的机械喷涂工程。定额包括 了回弹在内的各种材料损耗。施工中如设计壁厚,材质与定额不符时,允许按相应定额换算。 九、预制块砌筑及安装 1.预制块砌筑,安装以单块重量50kg为界;小于50kg为砌筑,大于50kg为安装。 2.预制块砌筑执行相应部位的砌筑定额: (1)耐火浇注料预制块砌筑,执行异型黏土质耐火砖Ⅱ类砌体; (2)隔热耐火浇注料预制块砌筑,执行黏土质隔热耐火砖砌体; (3)执行砌筑基价时,应将基价中耐火砖换算为预制块的预算价格,其净用量为0.961m²,损耗率为 .5%,定额数量为0.975m。
、耐火喷涂料的工程量计算以“10m²”为计量单位,所有炉窑分部位及造型,按重质、轻质 时火喷涂料分别计算。喷涂回弹率(包括修型损失量)的计算公式如下: V,=Px (1+K)
式中:V。定额消耗量: P一一定额净用量; K一定额回弹率。 二、炉壳需作除锈处理时,可按接触面积计算。 三、耐火可塑料按实体积计算工程量,不得因具有压缩比要求而增加工程量。 四、耐火浇注料中如设计要求埋设钢筋或辅挂钢丝网时,其搭接长度或面积可一并计入工程量。 五、耐火捣打料工程量按实体积计量,不分部位、结构、造型,按热打和冷打划分项目,不得因有 压缩比要求而增加工程量。 六、不定形耐火材料施工模板(除步进梁用异形钢模板外),已按“m3”摊人定额内,不得重复 计算。 七、本章说明及工程量计算规则亦适用第五章补充项目
计量单位:m定额编号213464213465213466213467213~468213469反拱底V >30mV=5 ~30mV<5m²项目名称8 (mm)>100≤100> 100≤100>100≤100基价(元)1215.121617.691357.541786.691707.072207.44人工费(元)869.581112.60993.621263.231306.401638.03定额人工费(元)724.65927.17828.021052.691088.671365.03其其中规费(元)144.93185.43165.60210.54217.73273.00中材料费(元)146.04288.53146.04288.53146.04288.53机械费(元)199.50216.56217.88234.93254.63280.88名称单位单价(元)数量综合工日07工日140.646.1837.9117.0658.9829.28911.647工耐火浇注料(1.050)(1.050)(1.050)(1.050)(1.050)(1050))木板m2188.800.0650.1290.0650.1290.0650.129材料铁钉L70kg0.5000.9900.5000.9900.5000.990水5.940.2200.2200.2200.2200.2200.220卷场机带40m塔牵引:50kN台班264.740.1600.1600.1600.1600.1600.160木上圆锯机直径:500mm台班14.510.1200.2400.1200.2400.1200.240机械叉式起重机提升质量:3台班511900.1600.1600.1600.1600.1600.160涡浆式混凝土搅拌机出料容量:350L台班306.270.2400.2900.3000.3500.4200.500.126.
计量单位:m定额编号2134702134712~13472213473213474213475直斜墙V>30mV=5 ~30mV<5m项目名称 (mm)>100≤100>100≤100>100≤100基价(元)1609.042240.011791.762453.512225.762979.64人工费(元)1111.341446.761269.561632.691660.682103.69定额人工费(元)926.111205.641057.961360.571383.901753.08其其中规费(元)185.23241.12211.60272.12276.78350.61材料费(元)278.22555.13278.22555.13278.22555.13机械费(元)219.48238.12243.98265.69286.86320.82名称单位单价(元)数量人工综合工日07工日140.647.90210.2879.02711.60911.80814.958耐火浇料10501050050(1.050%10500木板m'2188.800.1240.2480.1240.2480.1240.248材料快L704911.1202.24011202.2401202.240水m?5.940.2200.2200.2200.2200.2200.220卷场机带40m塔:50kN台264740.1600.1600.1600.1600.1600.160木工锯机直径:500mm台班14.510.2300.4600.2300.4600.2300.460机械叉式起重机提升质量:3t511.900.1600.16001600.1600.1600.160涡浆式混凝土搅拌机出料容量:350L台班306.270.3000.3500.3800.4400.5200.620·127·
DB64/T 1746-2020 高延性混凝土加固技术规程计量单位:m定额编号2~13482213483213484213485213486213487隧形墙内径<2mV>30mV=5 ~30mV<5m项目名称8 (mm)>100≤100>100≤100>100≤100基价(元)1899.972505.432145.772839.642746.833558.29人工费(元)1424.121779.521639.302076.972182.172725.18定额人工费(元)1186.771482.931366.081730.811818.482270.98其规费(元)237.35296.59273.22346.16363.69454.20中材料费(元)229.38455.26229.38455.26229.38455.26机械费(元)246.47270.65277.09307.41335.28377.85名称单位单价(元)数量人综合工日07工日140.6410.12612.65311.65614.76815.51619.377时火浇注料1:0501.050)1050)10501.050)1.050)木板m2188.800.1020.2030.1020.2030.1020.203材料X钉I701910.9801.9600.98019600.9801960水5.940.2200.2200.2200.2200.2200.220卷扬机带40m塔力50kN01600.16001600.16001600160木工圆锯机直径:500mm台班14.510.1900.3800.1900.3800.1900.380机械式起重机摄升质量3台511900.1600.1600.1600.1600.1600.160涡浆式混凝土揽拌机出料容量:350L台班306.270.3900.4600.4900.5800.6800:810·129·
计量单位:m定额缩号213494213495213~496213497213498213499弧形顶V>30mV=5 ~30mV<5m²项目名称8 (mm)>100≤100>100≤100>100≤100基价(元)1966.362793.302195.913047.442720.113681.94人工费(元)1463.081989.771668.132216.352140.262789.59其定额人工费(元)1219.231658.151390.111846.951783.552324.66其中规费(元)243.85331.62278.02369.40356.71464.93中材料费(元)274.61550.09274.61550.09274.61550.09机械费(元)228.67253.44253.17281.00305.24342.26名称单位单价(元)数量人工综合工日07工日140.6410.40314.14811.86115.75915.21819.835时火注料(1050)C1.050210501.050610501050木板m2188.800.1230.2470.1230.2470.1230.247材料4910.83016600.8301.6600.830660水m5.940.2200.2200.2200.2200.2200.220扬机40m塔充方:50kN00.1600.1600.1600.1600.1600.160/0木工圆锯机直径:500mm台斑14.510.2300.4600.2300.4600.2300.460机械文式起重机提升质量:3%台班511900.1600.1600.1600.1600.1600.160涡浆式混凝上搅拌机出料容量:350L台班306.270.3300.4000.4100.4900.5800.690.131:
计量单位:m定额编号213510213511213512213513213514213515刚玉质耐火注料莫来石质耐火浇注料项目名称直斜墙圆形墙炉顶直斜墙圆形墙炉顶基价(元)3311.683811.234182.312832.193197.793568.73人工费(元)2490.882997.183298.432046.732425.202726.31其定额人工费(元)2075.732497.652748.691705.61其2021.002271.92规费(元)415.15499.53549.74341.12404.20454.39中材料费(元)415.37342.11411.07415.37342.11411.07机械费(元)405.43471.94472.81370.09430.48431.35名称单位单价(元)数量综合工日07工140.6417.71121.31123.453工14.55317.24419.385刚压质耐火浇注科预制块L0501050610500莫来石质耐火浇注料(1.050)(1.050)(1.050)材料2188.800.1530:1850.1860.1530.185铁钉L704.911.6801.4701.2501.6801.4701.250卷扬机带40m塔牵力50kN台26440.2000.20002000.1900.1900.190木工圆锯机直径:500mm台班14.510.3500.2900.3500.3500.2900.350机械双式起重机提升质量:3台班511.9002002002000.19001900190涡浆式混凝上搅拌机出料容量:350L台班306.270.8001.0201.0200.7100.9100.910.133.
计量单位:m定额编号213522213523213524213525213526213527反拱底V>30mV=5 ~30mV<5m项目名称8 (mm)>100≤100>100≤100>100≤100基价(元)1189.881631.161340.631811.561704.152261.80人工费(元)903.751188.551039.191350.571372.081751.81其定额人工费(元)753.13990.46865.991125.471143.401459.84其规费(元)150.62198.09173.20225.10228.68291.97中材料费(元)147.11289.60147.11289.60147.11289.60机械费(元)139.02153.01154.33171.39184.96220.39名称单位单价(元)数量人工综合工日07工日140:646.4268.4517.3899.6039.75612.456隔热耐火烧1.050).0501.050050C1050(050)木板2188.800.0650.1290.0650.1290.0650.129材料0.4000.40004000.4000.4000.400铁钉L70kg4.910.5000.9900.5000.9900.5000.990卷场机带40m塔全力:50kN台班264.740.0900.0900.0900.0900.090%木工圆锯机直径:500mm台班14.510.1200.2400.1200.240.0.1200.240机械钢奖式混摄上升机出料容量:350L台306.270.2200.27003200.3700.480叉式起重机提升质量:3t台班511.900.0900.0900.0900.0900.0900.090·135·
计量单位:m定额编号213534213535213536213537213538213539圆形墙内径>2mV>30mV=5 ~30mV<5m项目名称8 (mm)>100≤100>100≤100>100≤100基价(元)1545.772156.641731.372384.342191.072932.44人工费(元)1156.901523.831324.131723.971737.892220.00定额人工费(元)其964.091269.861103.441436.641448.241850.00其中规费(元)192.81253.97220.69287.33289.65370.00中材料费(元)230.45456.33230.45456.33230.45456.33机械费(元)158.42176.48176.79204.04222.73256.11名称单位单价(元)数量人综合工日07工日140.64工8.22610.8359.41512.25812.35715.785高耐火料am1.050)CL0501050)(1:050)Q0501.050木板m2188.800.1020.2030.1020.2030.1020.203材400.40004000.4000.4000.400铁钉L70kg4.910.9801.9600.9801.9600.9801.960卷场机带40m塔车力:50k264740.0900.09000900.0900.0900:090木工圆锯机直径:500mm台班14.510.1900.3800.1900.3800.1900.380机械米式混凝士揽拌机出料容量:350L0.2800.3300.34070.4200.4900.590叉式起重机提升质量:3台班511.900.0900.0900.0900.0900.0900.090.137.
高架平台满堂支架施工方案计量单位:m定额编号213552213553213554213555213556213557狐形顶V>30mV=5 ~ 30mV<5m²项目名称8 (mm)>100≤100> 100≤100> 100≤100基价(元)1799.172618.581989.682853.722468.373425.88人工费元)1364.491889.781536.632097.361969.382617.45定额入工费(元)其1137.071574.821280.531747.801641.152181.21其中规费(元)227.42314.96256.10349.56328.23436.24材料费(元)275.68551.16275.68551.16275.68551.16机械费(元)159.00177,64177.37205.20223.31257.27名称单位单价(元)数量人综合工日07工日140.649.70213.43710.92614.91314.00318.611工热耐火浇注料1.0501050)(1.050)(1.050)(1.050)(1050)木板2188.800.1230.2470.1230.2470.1230.247材料0/8300.8301.6600.8301.660水5.940.4000.4000.4000.4000.4000.400卷场机带40m塔牵力:50kN台E264740.0900.0900.0900.0900.0900.090木工锯机直径:500mm台班14.510.2300.4600.2300.460.0.2300.460机械叉式起重机提升质量:3台班511900.0900.0900.0900.0900.0900.090涡浆式混凝土搅拌机出料容量:350L台班306.270.2800.3300.3400.4200.4900.590·140·
三、密闭式炉壳耐火(隔热)浇注料计量单位:m定额编号213564213565213566213567隔热耐火浇注料耐火浇注料项目名称8 (mm)>100≤100>100≤100基价(元)2696.133576.863154.554102.97人工费(元)2163.322769.482531.523196.18其定额人工费(元)1802.772307.902109.602663.49其中规费(元)360.55461.58421.92532.69中材料费(元)230.45456.33229.56455.44机械费(元)302.36351.05393.47451.35名称单位单价(元)数量综合工日07工日140.6415.38219.69218.00022.726T隔热耐火烧来1.0501050耐火浇注料m(1.050)(1.050)材木板m2188.800.1020.2030.1020.203料水5.940.4000.4000.2500.250铁钉170ke4910.9801.9600.9801.960卷扬机带40m塔牵引力:50kN台班264.740.0900.0900.1600.160木上圆锯机直径:500mm台班14.510.1900.3800.1900.380机械涡浆式混凝土搅拌机出料容量:350L台班306.270.7500.9000.8701.050叉式起重机提升质量:31台班5)(900.0900.0900.1600.160·142
十、人工涂抹不定形耐火材料计量单位:10m定额编号213625213626213627213628轻质不定型耐火材料重质不定型耐火材料项目名称涂抹厚度(mm)20 502050基价(元)749.351900.54943.002363.40人工费(元)693.641736.62873.232183.58定额人工费(元)578.031447.19其727.691819.65其规费(元)[15.61289.43145.54363.93材料费(元)0.360.950.53 1.31机械费(元)55.35162.9769.24178.51名称单位单价(元)数量综合工目07工日140.644.93212.3486.20915.526轻质不定型耐火材料(0.240)0.600材重质不定型耐火材料(0.240)(0.600)料5:940.0600.1600.0900.220卷扬机带40m塔牵弓[力:50kN台班斑264.740.0200.0600.0300.080机械叉式起承机提升质量:3台班511.900.0200.0600.0300.080涡浆式混凝土搅拌机出料容量:350L台班306.270.1300.3800.1500.380·156·