万豪设计英文标准(2007)DS-CY-Asia-2007June-M07_Guestrooms,corridors,EGL(客房走道).pdf

万豪设计英文标准(2007)DS-CY-Asia-2007June-M07_Guestrooms,corridors,EGL(客房走道).pdf
仅供个人学习
反馈
标准编号:
文件类型:.pdf
资源大小:0.6 M
标准类别:其他标准
资源ID:304478
下载资源

标准规范下载简介

万豪设计英文标准(2007)DS-CY-Asia-2007June-M07_Guestrooms,corridors,EGL(客房走道).pdf

Example:48mSuitePlan

1.Bathroom Fixtures<15B>

某特大桥跨北环线桩基承台施工方案2.Bathroom:

June2007 7A

GuestroomCorridors&SupportSpaces

GuestroomCorridors&SupportSpaces

Table of Contents

Marriott Confidentialand Proprietary Information

The contents of the Design Standards are confidential and proprietary to Marriott International, Inc. and may not be reproduced, disclosed, distributed or used without the express permission of an authorized representative of Marriott. Copyright, Marriott International, Inc., unpublished material. All rights Reserved

GuestroomCorridorsandSupportSpaces

GuestroomCorridorsandSupportSpac

B.GuestroomCorridors

D.Ice Service

1. Program: Locate ice service convenient to guests in a central location, such as the retail store.Sensitively plan and locate to minimize exposure(noise and views)from guestroom corridor or public area.As an alternate,ice may be provided by RoomService,depending on the local marketand custom. 2. Ice Dispenser: Provide ice dispensing unit (not bin type) to ensure the sanitation of the ice. 3. Size / Area: . Entry: Minimum 0.9 m (3 ft.) wide . Ice Machine Area: Minimum 2 m² (20 sq. ft) for ice machine/dispenserwhenrequired

GBT 39567-2020 多旋翼无人机用无刷伺服电动机系统通用规范.pdfG.Exit Stairs

ExecutiveGuestLounge(EGL)

Table of Contents

The contents of the Design Standards are confidential and proprietary to Marriott International, Inc. and may not be reproduced, disclosed, distributed or used without the express permission of an authorized representative of Marriott.

Copyright, Marriott International, Inc., unpublished material. All rights Reserved

riott Confidentialand ProprietaryInformati

ExecutiveGuestLounge

雷神店至崇溪河段高速公路C8合同段施工组织设计B.Entrance/ Fover

©版权声明
相关文章