GB50403-2017 炼钢机械设备工程安装验收规范及条文说明.pdf网机械设备工程安装验收规范
中华人民共和国住房和城乡建设部 中华人民共和国国家质量监督检验检疫总局
炼钢机械设备工程安装验收规范
Codeforengineeringinstallation acceptanceof
XFT 3006-2020 灭火剂及防火阻燃产品快速检定技术要求.pdf主编部门:中国冶金建设协会 批准部门:中华人民共和国住房和城乡建设部 施行日期:2018年4月1日
国计划出版社 2017 北京
中华人民共和国住房和城乡建设部公告
住房城乡建设部关于发布国家标准 《炼钢机械设备工程安装验收规范》的公告
中华人民共和国住房和城乡建设部 2017年7月31日
设备基础、地脚螺栓和垫板
16.1 真空罐 16.2 真空罐盖车及轨道 16.3 真空罐盖及罐盖升降机构 16.4 测温取样装置
本规范用词说明 引用标准名录 附:条文说明
Generalprovisions ? Terms (2) Basicrequirements (4) Equipment foundation,anchor bolt and base plate.....(10) 4.1Generalrequirements (10) 4.2Equipmentfoundation. (10) 4.3Anchorbolts.... (11) 4.4Baseplates (11) Equipmentandmaterialsmobilization (13) 5.1Generalrequirements (13) 5.2Inspection and acceptance ofequipmentandmaterials ., (13) Metalmixer (14) 6.1Base seatandrollertable (14) 6.2Furnaceshellandferrule (15) 6.3Tiltingdevice* (16) 6.4Covercarriagemechanism (17) 6.5Testrunning.. (18) 7Meltmetalpretreatmentequipment (19) 7.1Desulfurizerconveyingequipment (19) 7.2 2Mixinganddesulfurizingequipment (20) 7.3 1 Blowinganddephophorizingequipment (21) 7.4 Melten iron tankcar and itsrail (23) 7.5Slagclearingmachineanditsrail (24) 7.6Testrunning (25)
Generalprovisions 2 Terms (2) Basicrequirements (4) Equipment foundation,anchor bolt and base plate.....(10) 4.1Generalrequirements (10) 4.2Equipmentfoundation. (10) 4.3Anchorbolts.... (11) 4.4Baseplates (11) Equipmentandmaterialsmobilization (13) 5.1Generalrequirements (13) 5.2Inspection and acceptance ofequipmentandmaterials (13) Metalmixer (14) 6.1Base seatandrollertable (14) 6.2Furnaceshellandferrule (15) 6.3Tiltingdevice.. (16) 6.4Covercarriagemechanism (17) 6.5Testrunning.. (18) 7Meltmetalpretreatmentequipment ··· (19) 7.1Desulfurizerconveyingequipment (19) 7.2 2Mixinganddesulfurizingequipment (20) 7.3 8Blowinganddephophorizingequipment (21) 7.4Melten iron tank car anditsrail (23) 7.5Slagclearingmachineanditsrail (24) 7.6Testrunning (25)
Converterandargon oxygen decarburizationfurnace (26) 8.1 Trunionbearingpedestal....... (26) 8.2 Backingring (27) 8.3 Converterproper (28) 8.4 Tiltingdevice· (30) 8.5 Movableguardplateand fixedguardplate, movablestopper... (32) 8.6 1 Blockthe door in front of and afterthefurnace,main controlroomprotectiondevice... 8.7 Ladlecappingdevice,repair tower (34) 8.8 AODgassupplydevice (34) 8.9 Testrunning (35) Rawmaterialsystem (36) 9.1 Weighing hopper,collecting hopper and rotary hopper ......(36) 9.2 Ironalloybakingdevice.......... (36) 9.3 Testrunning (37) 10 1 Oxygenlanceandsublance (38) 10.1 Oxygenlance,sublance (38) 10.2 Lifting device,traverse device,turning device (38) 10.3 Nitrogensealingdevice (41) 10.4 Headingmachine and removingmachinefor sublance detector,detectorchute (42) 10.5Testrunning (42) 一 Smokecoverequipmentandafterheatboiler (44) 11.1 Generalrequirements (44) 11.2 Petticoat (44) 11.3 Removablehood (45) 11.4 Flue·. (46) 11.5 Boilerdrum
11.6Heataccumulator (48) 11.7Deaerizationbox (49) 11.8Testrunning 12 Gaspurificationequipment (51) 12.1Generalrequirements ··· (51) 12.2 Wetgaspurificationequipment (51) 12.3Drygaspurification equipment ·...· · (52) 3 (53) 13.1Thermal slag treatmentequipment (53) 13.2Rollerslagtreatmentequipment (54) 13.3Testrunning (56) 4 Electricalarcfurnace· (57) 14.1 Railsupport. (57) 14.2 Swayingrack (58) 14.3 Tiltingdevice,lockingdevice (60) 14.4 EAFproper. ·· (60) 14.5 EAFcover,electricalpolerototionmechanism and lifingmechanismofEAFcover (62) 14.6Lifting andretainingmechnismofelectricalpole . (63) 14.7 Oxygenlance ··· (64) 14.8Feeding device,water cooledhood,hotmetal ladle tiltingmechanism.... (64) 14.9Testrunning (66) Ladlerefiningfurnance S (67) 15.1 Ladlecar anditsrail.... (67) 15.2 LFcoverandliftingmechnism (67) 15.3Lifting andretainingmechnism ofelectricalpole (68) 15.4T Temperature measuring and samplingdevice,argon stirringdevice (69)
1.0.1为了保证炼钢机械设备工程安装质量,统一质量验收标 准,制定本规范。 1.0.2本规范适用于新建、改建和扩建炼钢机械设备工程安装 验收。
1.0.3本规范为炼钢机械设备工程安装的基本要求;当设计文件
.0.4炼钢机械设备工程安装质量验收除应执行本规范的
外,尚应符合国家现行有关标准的规定
一种在常压下从钢包底部吹氩,并用电弧对钢液进行加热,对 钢液进行调整和均匀化学成分、温度的钢水精炼装置。
一种钢液真空环境内脱气装置,它将盛钢液的钢包置于与真 空泵连通的密闭真空罐内,从钢包底部通入氩气搅拌钢液,使钢液 在真空状态下发生脱气反应
2.0.3真空吹氧脱碳炉(VOD)
tion furnace
2.0.4循环真空脱气精炼炉(RH)
一种对钢液真空循环脱气的精炼方法,它利用真空室底部的 两根环流管(浸渍管)插人钢包液内,通过上升管内充氩气作为提 升气体,利用气泡泵原理使钢水不断从上升管流入真空室,再从下 降管流回到钢包,形成循环流动,使钢水在真空室内实现深脱气 处理。
MHT 4052-2021 通用航空飞行动态数据传输规范.pdf6 氩氧脱碳精炼炉(AOD) argonoxygendecarburiz
tionfurnace 一种在转炉的钢液熔池底侧面,按不同比例往钢液吹入 与氩气的脱碳精炼炉,主要用于冶炼不锈钢。
sealedargonbubbling
一种在钢包内通过加金属铝或硅氧化放热来提高钢液 实现在钢包底吹氩气搅拌钢液条件下,在浸入罩内加合金调 液成分的装置
【法律法规6】《建设工程勘察设计管理条例》(国务院令第 662 号).pdf2.0.8密闭吹氩吹氧精炼炉(C
3.0.1施工现场应有相应的施工技术标准,健全的安全、质量管 理体系,质量控制及检验制度,应有经审批的施工组织设计、施工 专项方案、施工作业设计等技术文件。