GB 50016-2014 英文版 建筑设计防火规范(2018年版).pdf

GB 50016-2014 英文版 建筑设计防火规范(2018年版).pdf
仅供个人学习
反馈
标准编号:
文件类型:.pdf
资源大小:87.3 M
标准类别:建筑工业标准
资源ID:338458
下载资源

标准规范下载简介

GB 50016-2014 英文版 建筑设计防火规范(2018年版).pdf

Table 7.1.6Storage volumes of stackvards or tank farms

.2Operationsiteforfirefightingandrescueandopeningforfirefighteraccess

DL/T 668-2017标准下载73Fire elevator

7.4Helicopterlanding

7.4Helicopterlandingpad

8.1Generalrequirements

8.2Indoorfire hydrar

8.3Automaticfireextinguishingsvstem

floor area greater than1 000m

production workshops and Class C storerooms, where it is not applicable for automatic sprinkler systems according to what specified in this code,other automatic fire extinguishing systems shall oe installed,and fire extinguishing systems like fixed firemonitor extinguishing systems should be acammanded

8.3.6Watercurtainsystems should beinstalledatthefollowing locations:

3.3.7Deluge sprinkler systems shall be installed in thefollowing buildings or atthefollowing

8.4Firealarm system

Firealarmsystemsshallbeprovidedforthefollowingbuildingsorlocations: 1Factorybuildingsforshoemaking,clothingmaking,toys and electronics withfloor area

8.5Smokecontroland smokeexhaustsyste

9Heating,ventilatingandairconditioning

9.1Generalrequirements

9.2Heating

9.3Ventilating andair conditioning

Pressurereliefdevicesshallbeinstalledforallthedustcollectors,filtersorductsfiltering

9.3.11Ducts of ventilating and air conditioning systems shall beprovided withfire dam

10Electricalsystem

i0.2Powerlineandelectricalequipment

Minimum B factory buildings(storag stackvards(m

10.3Fireemergencylighting and directionalexit sigr

11 Timberbuildings

11 Timberbuildings

Table 11.0.10 Fire separation distance(m)between any two civil timber buildings, civil timber buildings and other civil buildings

12Urban road tunnel

12Urbanroad tunnel

12.1Generalrequirements

12.2Fire water supply and fire extinguishing equipment

3.1 Smoke exhaust facilities shall be provided for Class , and Il vehicletunnels

12.4Firealarmsystem

墙面抹灰施工工艺12.4Firealarmsystem

2.5Powersupplyandotherrequirements

AppendixACalculationmethodofbuildingheightandnumberofstorey

AppendixBCalculationmethodoffireseparationdistance

Explanationofwordinginthiscode

List of quotedstandards

建筑工程塑胶跑道施工组织设计tofquoted standar

©版权声明
相关文章