施工组织设计下载简介
内容预览随机截取了部分,仅供参考,下载文档齐全完整
1951.新建办公楼工程施工施工组织设计(中英文对照).doc对照排板图编号检查复核所需板的几何尺寸,并按误差大小归类;检查板材磨光面的疵点和缺陷,按纹理和色彩选择归类。对有缺陷的板,应改小使用或安装在不显眼的部位。Check the geometric size according to the board which have serial number, and sort out according to the error size.
在选板的基础上进行预拼工作。Piece together the board in advance base on the selected boards.
预拼好的石材应编号骑士公馆住宅小区铝合金门窗施工组织设计,然后分类竖向堆放待用。The boards which have been pieced together should be marked number, and then piled up vertically as class.
6.1.6饰面安装的一般要求General requirement for the installation of granite
6.1.6.1饰面板的接缝宽度如设计无要求时,应符合有关规范的规定; If seam width of panel design of the decoration have no requirements, should accord with the regulations of relevant norms.
6.1.6.2饰面板安装,应找正吊直后采取临时固定措施,以防灌注砂浆时板位移动。Adorn panel installation, should take fixed measure temporarily hang frank, in order to prevent the displacement of board while pouring into mortar.
6.1.6.3饰面板安装,按缝宽度可垫木楔调整。并应确保外表面的平整、垂直及板的上口顺平。The decorations panel is installed, can pad the chuck to adjust according to the width of sewing. Should also guarantee outer surface is levelled, vertical and the the board one is suitable for reading and suitable and flat.
6.2 轻质内隔墙的施工方法Construction method of the light weight partition wall
6.2.1.2工艺流程 The procedure
在结构验收后进行墙位放线 墙基(垫)施工 安装沿地、沿顶龙骨 固定各种洞口及门 安装一侧石膏板 水电管穿线并经验收后 安装另一侧石膏板 接缝处理 连接固定设备、电气 墙面装饰 踢脚线施工
6.2.1.3龙骨安装要点 The key requirements for installing keel
6.2.1.3.1应按弹线位置固定沿地、沿顶龙骨及边框龙骨,龙骨的边线应与弹线重合。龙骨的端部应固定牢固GB@T50430-2007《工程建设施工企业质量管理规范》.pdf,龙骨与基体的固定点间距就不大于1m。Should be fixed along the ground, along carrying fossil fragments and frame fossil fragments in the position of line according to playing, the sideline of fossil fragments should be with playing the line coincidently. The tip of fossil fragments should be fixed and firm, the intervals of fixing point of the fossil fragments and matrices are not greater than 1m
6.2.1.3.2安装竖向龙骨应垂直,龙骨间距应符合设计要求。It should be vertical to install fossil fragments of verticality, the interval of fossil fragments should accord with the designing requirement.
6.2.1.4石膏板安装The installation of gypsum board:安装石膏板之前,应检查骨架牢固程度,应对预埋墙中的管道、填充材料和有关附墙设备采取局部加强措施,进行验收并办理隐检手续,经认可后方可封板。Before installing the gypsum board, we should check the firm intensity of skeleton, and should be to burying the pipeline in the wall, packing materials and enclosing the apparatus of the wall to take the part to strengthen the measure relevantly in advance, confirm and go through formalities of examining latently, only after that , can seal the board.
6.2.1.4.1石膏板应在无应力状态下安装,不得强压就位。安装应从中部向四周固定。Gypsum board should be installed under no stress, can't suppress to take place. And installing should turn towards the middle part all around fixedly
6.2.1.4.3安装石膏板时,板与周围基体应松散地吻合,应留有<3mm的槽口,先将6mm左右的嵌缝膏加注好再放板,挤压嵌缝膏使其和邻近表层紧紧接触,然后按常规方式钉板。While installing the gypsum board, the board and matrices around should be identical fluffily, should leave 6.3铝合金吊顶安装要点The key requirements for installing the ceiling 6.3.1为了保证吊顶饰面的完整性和安装可靠性,在确定龙骨位线时,需要根据铝合金板的尺寸规格,以及吊顶的面积尺寸来安排吊顶骨架的结构尺寸。对铝合金板饰面的尺寸布置要求是:板块组合的图案要完整,四周留边时,留边的尺寸要对称或均匀。In order to guarantee to hang integrality of a of veneer and installation dependability, while confirming the location line of fossil fragments, need it according to the size specification of the aluminium alloy board And hang area size that carry to arrange for and hang the physical dimension of a skeleton The size to the board veneer of aluminium alloy is assigned the requirement: Ones that make up plate pattern is the intact,it stay all around when,it stay size take it symmetrical or even. 6.3.2铝合金板与轻钢龙骨骨架的安装钢筋混凝土工程施工方案,主要采用吊钩悬挂式或自攻螺钉固定式,也可采用铜丝扎结。Aluminium alloy board and light steel fossil fragments installation of skeleton, mainly adopt the hanging type of clivers or specialize in the fixed type of the screw by oneself, can also adopt the copper wire to pitch and form