标准规范下载简介
GB 51171-2016 通信线路工程验收规范(英文版).pdf8.9Other ProtectionRequirements
Optical(Electrical)CableCrossConnectionBoxandDistribution Device
杭州绿园土建、安装工程施工组织设计9.2 Installation of Distribution Device
10Optical(Electrical)CableSplicing
10.1General Reguireme
Table 10. 2. 3Attenuation limit of optical fiber joint
edundancy optical cable for optical cable splice shall be wired on reels according to the design nts. Reserved cables shall be installed on nearby poles at both sides of the cross connectior tical cables crossing the poles shall be protected with pipes,and the radius of redundancy cable
The splicing of micro cable shall meet the following reguirements:
10.3 Splicing and Encapsulation of Electrical Cable
nstallation of Optical (Electrical) Cable in the Equi
1.2Installation of Optical Cable Termination
igure 11. 3. 2Terminal Cable Banding
11.3.3The banding position of terminated cable in main distribution frame shall meet the following requirements: 1The coil out plane of terminated cable wire shall be parallel to the entrance hole of vertical terminatingblockonmaindistributionframe. 2The distance between coil out planes of terminated cable on each column and vertically mounted flat steels shall be kept consistently
12Optical(Electrical)CableTest
[2. 1Optical Cable T
Table 12. 2. 1 Record list for cable electrical performance test
14FinalAcceptanceofWork
Table 14. 1. 2 (Continued)
[able 14. 1.3 (Continued)
14.2Preliminary Acceptance
Lable 14. 2.3 (Continued)
Note: If the work des dispersion and PMD shall be carried out
14. 4Final Acceptance
AppendixB RequirementsforEarthingResistanceofLightning Wire and Lengthof Extension Line (Underground Part)
钢筋砼现浇结构质量控制AppendixB RequirementsforEarthingResistanceofLight Wire and Length of Extension Line (Underground Part)
AppendixC RequirementsforEarthingResistance of Optical (Electrical) Cable Suspension Wires and OtherFacilities
C. o.1The earthing resistance of earth wire of cross connection box shall not be greater thar C.0.2The earthing resistance of the user's protector shall not be greater than 502. C. 0. 3 Earthing resistance of other line facilities shall not be greater than the value in Table Table C. 0. 3Requirements for Earthing Resistance of Optical (Electrical) Cable Suspension Wire and Other Fa
AppendixETestRecordforRepeaterSectionofOpticalCableLine
Appendix FPermissible ReductionValue of AirPlug Pressure
AppendixGPermissibleAirPressureReductionof PlasticCablein24h
Explanation of Wording in This Code
List of Quoted Standards
DB37/T 5010-2014标准下载t of Quoted Standar